BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 28, 2023 at 8:00 PM

Updated February 13, 2024

Renovation of an educational facility in Renton, Washington. Completed plans call for the renovation of a educational facility.

For Kennydale Elementary Security Enclosure Bid Bond: This Project is estimated to cost $150,000.00 or more must be accompanied by a certified check, bank cashiers check, or bid bond, equal to 5% of the total Base Bid only, excluding taxes. Make checks payable to the Renton School District; furnish bond executed by a licensed bonding agency authorized to do business in the locality of the project. Prevailing Wage: It is the responsibility of the bidder to go online to the L&I web page electronically to verify they have the most current prevailing wages at time of bid Apprenticeship Requirement: This Project is not estimated to cost one million dollars or more. If selected, then this Project is subject to the apprenticeship requirements of ROW 39.04.320. Bidders may contact the Department of Labor & Industries, Apprenticeship Section, to obtain information on available apprenticeship programs. Bidders may contact the Department of Labor & Industries, Apprenticeship Section, to obtain information on available apprenticeship programs. Right to Reject: The Owner reserves the right to accept the lowest or any other Bid, the right to reject any or all Bids, and the right to waive any irregularities in any Bid. Withdraw of Bid: No Bid may be withdrawn, except with the express permission of the Owner, after the time set for the opening thereof, unless the award of Contract is delayed for a period exceeding 45 days. The Work includes, but is not limited to: Enclosure of front entry to form an entry vestibule with associated architectural, structural, electrical. and mechanical modifications A. The Owner has set the following indoor air quality goals for job site operations on the Project, within the limits of the construction schedule, contract sum, and available materials, equipment, products and services. Goals include the following. 1. Protect workers on the site from air quality problems during construction. 2. Prevent indoor air quality problems in the completed facility. B. Use safety meetings, signage, and subcontractor agreements to communicate the goals of the Construction Indoor Air Quality Management Plan. C. Conduct regular inspection and maintenance of Indoor Air Quality (IAQ) measures including ventilation system protection and ventilation rate

Award

Educational

$340,000.00

Public - City

Renovation

15

16

10

6

Subscribe For Documents

15 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
190
Active Projects
98
Bidding Soon
1,749
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 25, 2023

August 24, 2023

Project location map

1700 NE 28th St, Renton, WA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.