BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a sidewalk / parking lot in Forney, Texas. Completed plans call for site work for a 25-space sidewalk / parking lot; and for paving for a sidewalk / parking lot.

As of March 3, 2023, construction is underway. For Animal Shelter Parking Lot Addition All questions are required to be asked and answered from the website. Questions Deadline: January 4, 2023, at 3:30 PM Bidders must submit with their bids a Cashiers Check or a Certified Check in the amount of five (5%) percent of the maximum amount of the bid payable without recourse to the Owner or a proposal bond in the same amount. The contract award is contingent upon City Council approval at January 17, 2023, City Council meeting. Proposal envelope must state: RFP 2022-007 CITY OF FORNEY - ANIMAL SHELTER PARKING LOT ADDITION The work to be performed under the provisions of these Contract Documents consists of furnishing all materials, equipment, and tools; performing all necessary labor and supervision; and all work appurtenant to the construction of a new concrete parking lot with sidewalk connections and a 6 curb. The project consists of adding a new parking lot to the Forney Animal Shelter located at 201 Holly Leaf Trail, Forney, TX. This parking lot will be 120 long by 60 wide with a drive approach. The total 5 concrete pavement will be approximately 895 square yards. A 5 SOD will be included around the perimeter of the proposed parking lot. There will also be signage and pavement markings included. This added parking lot will provide the City of Forney Animal Shelter with 25 additional parking spaces as well as parking away from Centenary Drive which is a minor collector in our Thoroughfare plan. This will help with future development of this street. Bidders are required to provide all materials, equipment, and labor required for the construction of the project along with a Payment, Performance, and a 2-year Maintenance Bond in the amount of the Contract. The effective date of the maintenance period will commence upon the date of project acceptance by the City of Forney City Council. The successful Bidder will be required to furnish not only a performance bond in the amount of the Contract but also a payment bond for the protection of all claimants supplying labor and materials. All questions are required to be asked and answered electronically

Under Construction

Sidewalks / Parking Lot

$95,080.00

Public - City

Paving, Site Work

15

15

6

Subscribe For Documents

38 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
157
Active Projects
72
Bidding Soon
3,610
All Active Projects
1,428
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.