Renovation of a fire / police facility in Albany, Georgia. Completed plans call for the renovation of a fire / police facility.

Fire Station #7 Floor Replacement For additional information, contact Ricky Gladney, Buyer, at (229) 431-3211. Submit all questions via email to; rgladney@albanyga.gov cc: jswilliams@albanyga.gov, kross@albanyga.gov The deadline for questions is January 9, 2023, at 2:30 p.m. questions received after this deadline may not be answered. To remove the floor slab/drive area and excavate the subgrade material approximately eight (8) inches. The replacement of the subgrade material and concrete slab should be replaced in accordance with the geotechnical report provided by TTL, Inc, the structural report provided by Fletcher Engineering and the approved construction drawings. Compaction testing and written report will be required of the subgrade material prior to concrete slab being poured/installed. Fire Station #7, located at 2203 Leonard Ave, Albany, GA 31705, needs new concrete floor installed in both bays and drive areas due to a failing aggregate base and a newer heavier truck the Fire Department now uses. Bay 1 has been partially excavated and tested with several other samples taken and the results contained in the bid documents. It is required that the station remain open during the rehabilitation work. To accomplish this, each bay will be repaired individually, and care must be taken to ensure the fire fighters on duty have a safe ingress and egress while accessing all equipment and vehicles located in the open for use bay. The following is a summary of the procedures: 1. Remove the floor slab/drive area and excavate the subgrade material approximately eight (8) inches. The replacement of the subgrade material and concrete slab should be replaced in accordance with the geotechnical report provided by TTL, Inc, the structural report provided by Fletcher Engineering and the approved construction drawings. 2. Replace and/or repair any plumbing lines, discharge lines from the oil/water separator prior to placement of finished concrete. 3. Replace and/or repair any electrical lines prior to placement of finished concrete. 4. Compaction testing and written report will be required of the subgrade material prior to concrete slab being poured/installed. 5. Replace/repair brick veneer that has previously fallen and/or falls during time of excavation of the existing concrete. 6. Replace and finish concrete with a grade suitable for the new heavier trucks the City is now using

Award

Fire / Police

$410,385.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
90
Active Projects
27
Bidding Soon
506
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 19, 2023

February 20, 2023

Project location map

2203 Leonard Ave, Albany, GA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.