Demolition, site work and new construction of a warehouse / distribution facility in Cornwall, Vermont. Completed plans call for the demolition of a warehouse / distribution facility; for the construction of a 5,900-square-foot warehouse / distribution facility; and for site work for a warehouse / distribution facility.

The Town of Cornwall is seeking a General Contractor, to oversee the permitting, demolition of the existing salt/sand shed and preparation of the site for its hoop-structure replacement, including demolition of the existing structure, the setting of the block walls and installation of the floor and apron to the specifications of new structure's manufacturer. The new structure will be contracted by the town. Erection of the structure will be done by the structure manufacturer as part of that contract. The project site work can start May 1, 2023 and will be completed by september 1, 2023. The contractor will carry and provide proof of appropriate insurance. This project will include several stages to be completed between May 1, 2023 and September 1, 2023. It will include coordination and communication with a town appointed representative as needed. All processes will conform to Accepted Construction Practices and those prescribed by the structure manufacturer. 1: Secure all required permits related to this project, including but not limited to demolition, town Zoning, and construction. Scheduling/coordination with the structure manufacturer and any other contractor will be required. 2: The demolition of the existing salt/sand building including the structure, concrete, and asphalt according to permits and state regulations. 3: The excavation and site preparation for the new structure. This includes but is not limited to drainage, stone base for the walls and the base for the floor and apron. 4: The setting of new concrete block walls to meet the requirements of the structure manufacturer. The eight (8) foot walls will be of high-quality concrete blocks, keyed and secured. 9: Placement of a concrete or asphalt floor and apron. 6: The fabric structure will be erected by the structure manufacturer.

Post-Bid

Warehouse / Distribution

$90,000.00

Public - City

Demolition, New Construction, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
62
Active Projects
29
Bidding Soon
448
All Active Projects
206
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 20, 2023

May 1, 2023

img_map_placeholder

Multiple Locations, Cornwall, VT

Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.