BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 19, 2023 at 8:00 PM

Updated September 20, 2023

Renovation of a mixed-use development in Gwinn, Michigan. Completed plans call for the renovation of a educational facility.

Project consists of removal and replacement of classroom unit ventilators. Removal of indoor suspended gym air handling units and installation of new rooftop gym units. Structural steel reinforcement to support the new rooftop gym units. Replacement of hot water boiler system and pumps. Installation of gas piping to support the new equipment and new DDC controls (BACNET) and new front end for control of all equipment both new and existing. Removal of an old ventilation fan and heating coil air handling unit in the basement. Existing equipment will be installed as DDC over existing pneumatic controls.

Award

Educational

$1,413,550.00

Public - City

Renovation

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
26
Active Projects
11
Bidding Soon
127
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 12, 2023

March 13, 2023

Project location map

Multiple Locations, Gwinn, MI

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.