BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 29, 2023 at 8:00 PM

Updated January 26, 2024

Demolition, site work, new construction and renovation of a mixed-use development in Gwinn, Michigan. Completed plans call for the demolition of a pre-engineered storage facility; for the construction of a pre-engineered storage facility; for the renovation of a pre-engineered storage facility; for site work for a pre-engineered storage facility; and water / sewer project.

Installation of a biosolids dewatering belt press and associated equipment including removal of existing RBC equipment, building demolition, construction of a pre-engineered steel building, site piping installation, electrical and controls, and general site restoration. Please contact Robb Anderson, P.E. at 906.214.4152 or raanderson@geiconsultants.com with questions regarding this project.

Award

Water / Sewer

$1,735,649.00

Public - County

Demolition, New Construction, Renovation, Site Work

64

22

10

6

Subscribe For Documents

22 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
19
Active Projects
7
Bidding Soon
124
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 28, 2023

March 30, 2023

Project location map

1080 M-94, Gwinn, MI


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.