BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 7, 2023 at 8:00 PM

Updated January 26, 2024

Site work, paving and outdoor lighting for a mixed-use development in Seatac, Washington. Completed plans call for site work for a sidewalk / parking lot; for paving for a sidewalk / parking lot; for outdoor lighting for a sidewalk / parking lot; transportation facility; transportation facility; transportation facility; and water / sewer project.

Install lighting improvements within the lot include poles, foundations, LED lighting fixtures, photo optic controls, conduit, conductors, load center, and utility connection. Install EV chargers within the lot include chargers, mount, new conduit, conductors, and a power center upgrade. Install Permanent restrooms within the lot include restroom facilities and utility connections. Install security cameras within the lot include poles, foundations, cameras, conduit, conductors, and communication connection. Landscaping and irrigation improvements within the lot to meet permit requirements. Flagging/Traffic Control Demolition Concrete Supply Cast-In-Place Concrete Saw Cutting Coating/Painting Signage Electrical Erosion Control Asphalt Paving Aggregate Supply Curbs, Gutters and Sidewalks Pavement Marking/Striping Fencing Site Furnishings Irrigation Landscape Underground Utilities Trucking (Dump Trucks) Manufactured Site Specialties Hardware Completion- 482 calendar days The Engineer's estimate range for this project is $2,500,000.00 - $5,000,000.00 The WMBE utilization goal is 10% for this contract. The South 160thStreet TNC Lot improvements will install permanent restroom facilities, electric vehicle chargers to serve 10 parking stalls, site lighting upgrades, and landscape upgrades. Asphalt demolition and paving is anticipated to be limited to utility trenching and restoration from construction impacts. Some re-striping of the TNC lot will be required to accommodate electric vehicle charger stalls and pedestrian circulation at the restroom facilities. Water and sewer utilities will be installed and connected to existing water and sewer service lines onsite to serve the new restroom facilities. The project is not anticipated to trigger stormwater thresholds which would require implementing stormwater improvements. The work area is located at the South 160th Street TNC Lot, outside of SeattleTacoma International Airport. MC-0321254 / WP#N03380 Question Cut-off Date: Mar 28, 2023, 3:30:00 AM

Post-Bid

Transportation Terminals

$5,000,000.00

Public - City

Outdoor Lighting, Paving, Site Work

66

25

22

2

Subscribe For Documents

14 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
194
Active Projects
107
Bidding Soon
1,731
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 6, 2023

June 5, 2023

Project location map

16135 Host Rd, Seatac, WA


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.