BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Lake Stevens, Washington. Completed plans call for site work for a water / sewer project.

This project shall provide all labor, materials, tools, equipment, associated appurtenances and transportation for the pump, motor, column pipe, and wire replacement, well cleaning and development and video inspection of the Lake Stevens Wells No. 1 and No. 2 located at approximately 2008 131st Ave. NE, Lake Stevens, WA 98258. If a Bidder uploads a file to Public Purchase, it is the Bidders responsibility to ensure the file is not corrupt or damaged. If the District is unable to open an attachment because it is damaged, corrupt, infected, etc., the District may disqualify the Bidders submission. The District will not guarantee responses to questions received via other forms of communication (phone, voicemail, text, IM, etc.). Snohomish County PUD #1 Water Utility owns and operates 9 separate water systems spread throughout Snohomish County serving approximately 23,000 customers. Currently the PUD maintains 17 main supply and booster pump stations with a combination of over 50 different end suction, vertical turbine, and submersible pumps and motors from 5-150 HP with flows between 20-1500 gpm. In addition, the PUD maintains approximately 17 supply wells with completed depths between 40' to 550', well casing diameters ranging from 6" to 16", drop pipe diameters ranging from 2" to 12", and a combination of submersible and vertical turbine deep line shaft pumps and motors from 0.5 to 150 HP with flows between 2.5 to 1200 gpm. 1. All mobilization and demobilization to and from the site as needed to remove and re-install both Well #1 and Well #2 piping (approximately 70' of 8" black iron column pipe, motor, pump, 1" PVC flush thread for pressure transducer, and associated appurtenances in a 14" -16" existing casing for each well). 2. Provide video inspection of both Well #1 and Well #2 to verify as-built dimensions, initial condition of screen, and depth to bottom of well and recommend any necessary rehabilitation to screen or well casing, if needed. 3. Remove / bail all accumulated scale and detritus from the tailpipe of both Well #1 and Well #2 4. Brush the 16"/14" well casing and screen to remove any loose scale then bail and clean out the screen and tailpipe for both Well #1 and Well #2. 5. Following brushing provide at least two (2) passes at not less than 10 minutes per station of cable tool surge and bail development through the well screen, monitoring the accumulation of material (if any) at each station and reaction of the well during the process. In the event that the well continues to make fine material or the tools are "tight" in some sections, provide another two (2) complete passes of the cable tool surge and bail development at not less than 10 minutes per station through the well screen. This work shall be completed for both Well #1 and Well #2 as modified by the project hydrogeologist based on the progress of the development and observations of the material produced. 6. At completion of the Well #1 and Well #2 well development provide a final video inspection of both Well #1 and Well #2 to verify as-built dimensions, condition of screen, and depth to bottom of well and recommend any additional rehabilitation to screen or well casing, if needed. 7. 8. 9. H Rev. 11/29/22 ni J Public Utility District No. 1 of Snohomish County Everett, WA 98201 Inspect Well #2 pump and motor for continued operation and temporarily install in Well #1 to get plant back into production until the new motor, pump, column pipe, and wire can be procured and installed. Remove and replace with new pump, motor, column pipe, and appurtenances when available. Provide and install new submersible motor, pump, wire, 8" black steel column pipe, and check valves as necessary for re-install for both Well #1 and Well #2. Submit cut sheets for all recommended equipment including pump and efficiency curves for review and approval by DISTRICT Project Lead in advance of order. Pump shall be selected to most efficiently meet Item b. below for stated design flow and total dynamic head (TDH).

Award

Water / Sewer

$298,000.00

Public - County

Site Work

3

6

4

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
156
Active Projects
84
Bidding Soon
2,400
All Active Projects
739
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

January 4, 2023

February 3, 2023

August 2, 2023

img_map_placeholder

2008 131st Ave NE, Lake Stevens, WA

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.