BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Site work and paving for a road / highway in Rialto, California. Completed plans call civil work for a road / highway.

estimate is $3,400,000 to $3,800,000. All questions about the meaning or intent of the Bid Documents are to be directed to the City Engineer. Questions shall be submitted in writing in Questions submitted after 3:00pm on Wednesday, December 21,2022, will not be accepted. ESCRIPTION OF THE WORK: The Work comprises the furnishing all materials, equipment, tools, labor, incidentals, all implied requirements, and all appurtenant work as required by the Plans, Specifications, and Contract Documents for the above stated project. The general items of work to be performed hereunder consist of traffic control; implementation and maintenance of Best Management Practices SWPPP; widening of southbound (SB) Alder Avenue to add a right-turn only lane at the State Route 210 (SR210) westbound (WB) on-ramp; restriping SB Alder Avenue to add a second left-turn lane at the SR-210 eastbound (EB) on-ramp and a second left-turn lane onto Renaissance Parkway; widening northbound (NB) Alder Avenue to provide dedicated right-turn lanes at the SR-210 EB on-ramp and onto Sierra Lake Parkway/West Casmalia Street; restriping NB Alder Avenue to add a second left-turn lane onto the SR-210 WB on-ramp; widening the SR-210 WB off-ramp terminus to provide a second left-turn lane; widening the SR-210 EB off-ramp terminus to provide a second left-turn lane; restriping SR-210 EB and WB on-ramps to convert the existing High Occupancy Vehicle (HOV) preferential lane to a generalpurpose lane; upgrading sidewalks and curb ramps to current American with Disabilities Act (ADA) standards along Alder Avenue where proposed improvements impact existing conditions; building retaining walls along the SR-210 EB off-ramp and along the dedicated right-turn lane on NB Alder Avenue at the SR-210 EB on-ramp; and adding guardrail/end treatments at the Alder Avenue NB and SB bridge approaches. The work also includes traffic striping and pavement markings, installation of detectable warning surfaces, video image vehicle detection systems and all associated work as identified on the construction drawings.

Post-Bid

Roads / Highways

$3,800,000.00

Public - City

Paving, Site Work

273

8

4

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
199
Active Projects
102
Bidding Soon
2,207
All Active Projects
993
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 10, 2023

March 13, 2023

img_map_placeholder

CA-210 & Alder Ave, Rialto, CA

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.