BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 14, 2023 at 8:00 PM

Updated January 26, 2024

Site work, paving and renovation of a mixed-use development in La Center, Washington. Completed plans call for the renovation of a clubhouse / community center; for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

For any questions about submittal of the bids call Tony Cooper at 360 263-2889 or by email at acooper@ci.lacenter.wa.us. PROJECT DESCRIPTION: The first part of the project consists of a kitchen remodel. In the kitchen, a new commercial hood for a gas grill and range will be added, with a fire suppression system, and replacing the existing appliances with commercial appliances. The second part of the project consists of reconstruction of portions of the parking lot drive aisle that has failing subgrade and pavement. Paving of the entire drive aisle shall be completed following reconstruction of the failing areas. Technical inquiries regarding the project should be directed to Tony Cooper, City Engineer, at City of La Center Community Development for the paving project and the kitchen remodel, at La Center, WA 98629, (360) 263-2889 for by email acooper@ci.lacenter.wa.us, All proposals must be submitted on the regular form furnished with the specifications, and each must be accompanied by a certified or bank check or bidder's bond, by a bonding company licensed to do business in the State of Washington, made payable to the City of La Center in an amount not less than five percent (5%) of the total bid. Work for the kitchen remodel shall be completed between February 15th to May 12th of 2023 within 63 working days after receipt of Notice to Proceed. The contract time working days may be suspended for ordering and delivery of the kitchen hood, or other materials on the project that could impact the schedule. Work for the parking lot portion of the project, shall be completed between June 1st, 2023 and September 7th 2023 within 70 working days. Any adjustment of this schedule shall be approved by the city. State of Washington Prevailing Wage is applicable to this work. This project will include sales tax in each bid item as described below. The CITY OF LA CENTER reserves the right to cancel this request or reject any and all bids received or to waive any minor formalities of this call if in the judgment of the City Council the best interest of the City would be served.

Award

Clubhouse / Community Centers

$667,336.00

Public - City

Paving, Renovation, Site Work

49

22

6

2

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
125
Active Projects
65
Bidding Soon
903
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 10, 2023

February 15, 2023

Project location map

Multiple Locations, La Center, WA


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.