Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Renovation of a transportation facility in Fernley, Nevada. Completed plans call for the renovation of a 4,442-square-foot, two-story above grade transportation facility.
This project includes replacement of the existing Fernley Train Depot building roof including but not limited to the following: Demolition of existing wood shingle roofing; installation of wood framing and blocking members; structural plywood sheathing diaphragm; self-adhered synthetic underlayment; metal flashings; composite roof shingles; attic roof vents; removal and reinstallation of existing metal ridge cap; batt insulation; removal and replacement of wood siding; and painting. Location of Work: 675 Main Street; Fernley, NV 89408 For questions regarding this project, and for complete contract requirements, contact: Keith Karpstein, P.E.; (775) 851-4788; Farr West Engineering; 5510 Longley Lane; Reno, Nevada 89511; kkarpstein@farrwestengineering.com The Engineer's Opinion of Probable Construction Costs of the project is between $380,000 and $420,000. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. This project includes demolition of existing dilapidated wood shingles and dimensional board wood sheathing in preparation of the installation of a new composite shingle roof system. Installation includes new structural plywood sheathing, blocking, flashing, adhered underlayment, roof ventilation and snow guards for a complete weatherproof roof installation. The project will require removal of partial existing wood siding to properly install new flashing at roof to wall or chimney locations. Verify all existing conditions and layout prior to construction.
Bid Results
Transportation Terminals
$369,964.00
Public - City
Renovation
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
January 12, 2023
February 13, 2023
675 E Main St, Fernley, NV
Related To This Project
Fernley, NV
--
Fernley, NV
--
Fernley, NV
--
Fernley, NV
--
Fernley, NV
Bid Date: Apr 05 2023
Fernley, NV
Bid Date: Apr 25 2023
Fernley, NV
Bid Date: Apr 05 2023
Fernley, NV
Bid Date: Apr 12 2023
Fernley, NV
Bid Date: Sep 12 2022
Fernley, NV
Bid Date: Sep 07 2022
Fernley, NV
Bid Date: Sep 24 2024
Fernley, NV
Bid Date: Jul 14 2022
Fernley, NV
Bid Date: Nov 02 2021
Fernley, NV
Bid Date: Jun 30 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.