BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and renovation of a civil project in Ambler, Pennsylvania. Completed plans call for the renovation of a water / sewer project; and for site work for a water / sewer project.

FILENOs. 2020-03071 & 2020-06158 PN-20-06158 The work consists of the construction and installation of a granular activated carbon treatment system with associated treatment building, backwash holding tank, chlorine contact tank and associated internal and external piping located adjacent to Ambler Borough Well #6 in Upper Dublin Township. All work is to be completed in strict accordance with the Project Manual and Drawings. CLARIFICATION DEADLINE : 1/30/2023 5:00 PM This project is subject to applicable provisions of Act 422, Pennsylvania Prevailing Wage Act as amended and prevailing minimum wage rates issued by the Pennsylvania Department of Labor and Industry. No Bidder may withdraw his bid within sixty (60) days after the date set for the opening of the bids. The Borough of Ambler reserves the right to reject any and all bids for any cause whatsoever, to eliminate any item or items from the contract, and to waive any informality in the bids. Liquidated Damages :- A. Contractor and Owner recognize that time is of the essence as stated in Paragraph 4.01 above and that Owner will suffer financial loss if the Work is not completed within the time specified in Paragraph 4.02 above, plus any extensions thereof allowed in accordance with Article 12 of the General Conditions. The parties also recognize the delays, expense, and difficulties involved in proving in a legal or arbitration proceeding the actual loss suffered by Owner if the Work is not completed on time. Accordingly, instead of requiring any such proof, Owner and Contractor agree that as liquidated damages for delay (but not as a penalty), Contractor shall pay Owner $1,000 for each day that expires after the time specified in Paragraph 4.02 for completion and readiness for final payment until the Work is completed and ready for final payment. estimate for Contract 22-01E is $170,000 - $220,000

Bid Results

Water / Sewer

$216,887.00

Public - City

Renovation, Site Work

161

41

15

4

Subscribe For Documents

49 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
443
Active Projects
189
Bidding Soon
4,062
All Active Projects
1,870
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 2, 2023

March 6, 2023

img_map_placeholder

Multiple Locations, Ambler, PA

Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.