BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in Centerville, Ohio. Conceptual plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

Clyo and Dimco Way Intersection Improvements The services include the preparation of a formal feasibility study and construction contract plans for the widening of approximately .5 miles of Clyo Road, from 360 feet north of Saint Leonard Way to 150 feet south of Ole Quaker Court. The intersection improvements will stretch approximately 200 feet from the intersection of Dimco and Clyo West on Dimco Way as well. Both Clyo Road and Dimco Way design will include the installation of curb, storm sewer improvements, and a multi-use path. Technical or scope of services questions specific to the project or RFP requirements. Question Deadline 05/07/2024 at 2:00 PM ET Electronic SUbmission It is anticipated that the selected Consultant will be authorized to proceed by July 2024. Feasibility Study (Low-Level or Formal) 1/1/2025 Stage 1 Submitted for Review For Path 2 and higher projects, Stage 1 must include existing ROW line, construction limits, and temporary/permanent Preliminary ROW lines. (Allow ODOT 30 days for review) 8/1/2025 Stage 2 Submitted for Review For Path 2 and higher projects, Stage 2 must include existing ROW line, construction limits, and temporary/permanent Preliminary ROW lines. (Allow ODOT 30 days for review) 09/1/2026 Environmental Document Approved 8/1/2026 Stage 3 Submitted for Review (Includes Bid Document and Estimate) (Allow ODOT 30 days for review) 4/1/2027 Final Compliance R/W Plans Submitted 09/1/2026 PS&E Package to District (Includes Final Plans, Bid Document and Estimate) 10/1/2027 R/W & Utility Clearance by District (District certifies clearance to FHWA. LPA should submit R/W Control Letter to the District one (1) month before this date.) 10/1/2027 Updated Environmental Commitment Checklist (LPA should submit the environmental checklist (D7 format) to the District two (2) weeks prior to the Plan Package date.) 10/1/2027 Plan Package to C. O. (File Date) 12/1/2027 Sale Date (Bid Opening Date) 2/1/2028 Award Date (LPA should submit a summary of bid tabs and the identity of the awarded contractor to the District no later than one (1) week after the award.) 3/1/2028 Estimated Begin Construction 4/1/2028 Estimated End Construction 10/1/2029 The method of Contractor Selection has not been Determined at this time.

Conceptual

Roads / Highways

$4,633,700.00

Public - City

Paving, Site Work

5

5

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
121
Active Projects
55
Bidding Soon
1,306
All Active Projects
601
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 1, 2024

img_map_placeholder

Dimco Way & Clyo Rd, Centerville, OH


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.