BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 10, 2023 at 8:00 PM

Updated February 8, 2024

Site work for a civil project in Napa, California. Completed plans call for site work for a water / sewer project.

Project comprises labor, material and services necessary for: Major components of Project Work consist of installation of diversion valve to allow water flow from Rector Dam to Rector Creek. Work includes and not limited to installation of hot tap in existing water main, piping, shut off valve, flow meter, valves, power and communication lines from existing water treatment plant to flow control facility. Installation of transmission pipe is partially underground and supported by bridge pipe. Work also includes site work to install valve, installation of riprap, installation of revegetation and irrigation to satisfy environmental permit requirements. License required to bid the project: A Health and Safety Provisions: Contractor and all subcontractors shall abide by all health and safety mandates issued by federal, state, and local governments and/or public health officers as well as those issued by DGS, and worksite specific mandates. If multiple mandates exist, the Contractor and subcontractors shall abide by the most restrictive mandate. The term employee, worker state worker or state employee in health and safety mandates includes contractor and subcontractor personnel. Costs associated with adhering to health and safety mandates are the responsibility of the Contractor. Contractor is responsible for the tracking and compliance of health and safety mandates and may be audited upon request. Contractor will require staff, and subcontracted staff, providing onsite services at state facilities to show proof of full COVID-19 vaccination to the Contractor's designee or be tested at least once per week. Contractor shall communicate compliance to the Contract Administrator prior to initiating services and as requested. Contractor will not provide proof or any other health information to DGS. Full COVID-19 vaccination is defined pursuant to the Centers for Disease Control and Prevention Should change their definition, any change would apply. Successful bidder shall furnish payment and performance bonds, each in the amount of 100 percent of the Contract price. Bidders may place an order by contacting Office of State Publishing at 885 Riverside Parkway, West Sacramento, CA 95605; Telephone (916) 445-5386. The term of this project is 240 calendar days.

Bid Results

Water / Sewer

$711,775.00

Public - State/Provincial

Site Work

16

18

20

4

Subscribe For Documents

36 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
448
Active Projects
212
Bidding Soon
3,151
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 6, 2023

November 27, 2023

Project location map

7300 Silverado Trail, Napa, CA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.