Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Renovation of a water / sewer project in Fremont, Nebraska. Completed plans call for the renovation of a water / sewer project.
There is no mandatory pre-bid meeting. Each bid shall be accompanied by a certified check, cashier's check, or a bank draft on a solvent Nebraska bank insured by FDIC or a bid bond in the amount not less the five percent (5%) of the bid price. That bid security shall be sealed and addressed to the City Clerk, Fremont, Nebraska and labeled on the "Unit 8 Bottom Ash Submerged Conveyor Modification". Any bids received from contractors not so qualified will be returned unopened. The bid security shall guarantee the bidder's good faith to enter into the contract within sixty (60) days at the bid price if accepted by the City Council. Any proposal received which is not accompanied by a bid security will not be considered. The bid security of the successful bidder will be returned when the contracts have been signed, filed with and approved by the City. The bid security of the unsuccessful bidders will be returned when their bids are rejected. The City of Fremont hereby reserves the right to accept that bid which, in its judgment, will produce the best job of workmanship and material, whether or not it is the lowest bid; and reserves the right to reject any or all bids and to waive any or all informalities of any proposal. The successful bidder will be required to submit an acceptable Affirmative Action Statement and Program to the Office of the Mayor within ten (10) days after the bid has been awarded by the Fremont City Council. Failure to submit an acceptable Affirmative Action Statement and Program within the time allotted shall result in the forfeiture of the bidder's bond. The contractor shall be required to furnish a Performance, Payment and Maintenance Bond in a sum equal to one-hundred percent (100%) of the contract price, for a period of one (1) year past the completion of the project. Before the Final Payment may be made, the contractor shall furnish a written clearance from the Commissioner of Labor of the State of Nebraska, certifying that all payments then due of contributions or interest which may have arisen under the contract have been made by the contractor or his subcontractors to the Unemployment Compensation Fund. The contractor target date for completion of work is no later than October 31, 2025. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. All such notices and questions shall be addressed to: Greg Gesell, P.E. (Project Manager) ggesell@hdrinc.com 402-399-4978 and/or Gary Ogden Gary.ogden@fremontne.gov 402-727-2643 Fremont, NE 68025
Bid Results
Water / Sewer
$5,999,754.00
Public - City
Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
6
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 14, 2023
April 10, 2023
3000 E 1st St, Fremont, NE
Related To This Project
Fremont, NE
Bid Date: Feb 03 2023
Fremont, NE
Bid Date: Feb 07 2023
Fremont, NE
Bid Date: Jan 30 2023
Fremont, NE
Bid Date: Feb 07 2023
Fremont, NE
Bid Date: Feb 08 2023
Fremont, NE
Bid Date: Feb 14 2023
Fremont, NE
Bid Date: Mar 01 2023
Fremont, NE
Bid Date: Mar 07 2023
Fremont, NE
Bid Date: Jan 26 2023
Fremont, NE
Bid Date: Sep 28 2022
Fremont, NE
Bid Date: Sep 27 2022
Fremont, NE
Bid Date: Sep 27 2022
Fremont, NE
Bid Date: Aug 29 2022
Fremont, NE
--
Fremont, NE
Bid Date: Aug 30 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.