BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of an educational facility in Midland, Michigan. Completed plans call for the renovation of a educational facility.

MASONRY The work shall start after March 23, 2023, and shall be completed by April 6, 2023. If weather does not permit this start date, work may begin on June 1, 2023 and must be completed by June 23, 2023. -Remove 8' x 8' brick veneer that has bowed out at the top of the wall at the expansion joint on the north and south walls of exterior masonry. The brick veneer will be replaced and properly anchored to the existing block wall. -Install DryFix masonry anchors at 16" OC at the bottom four (4') foot of masonry wall below where the brick repair is being done to stabilize the wall and prevent future movement. - Remove all limestone caps around the structure including the wall that encloses the cooling tower and abuts the red canopy at the school entrance, install stainless steel flashing with drip edge, then reinstall existing limestone cap to prevent further infiltration of water/moisture into the masonry wall. - Remove and replace 25% of existing mortar joints at all elevations around the storage room and screen wall from the storage room to the canopy. -Remove and replace all sealant in existing expansion joints where the storage room meets the screen wall. - Remove and replace approximately 100 damaged bricks. -Expose the lintels above the man and overhead doors, clean the existing steel, apply rust inhibiting primer, and install flashing, weeps to allow water to escape, and drip edge. - Power wash the existing masonry to remove pollution stains and efflorescence. - Install sealant at the bottom of exterior masonry wall where the masonry meets the sidewalk. - Midland Public Schools will provide water and power to the project for mixing mortar and power washing at no cost to the contractor

Award

Educational

$42,000.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
89
Active Projects
51
Bidding Soon
752
All Active Projects
317
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 20, 2023

March 24, 2023

img_map_placeholder

800 W Chapel Ln, Midland, MI


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.