Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Create your *free account*
Fill in a few details to keep viewing projects.
You've used your *free project views*
Register today to keep viewing commercial construction projects bidding in your area.
With ConstructConnect Project Intelligence, you can:
- Filter 825,000+ active commercial projects down to the ones that fit your trade and area
- Reach the right people with contact info for 575,000+ construction companies
- See who's bidding before you put in the hours
- Get daily email updates and alerts on the projects you're watching
Published February 20, 2023 at 7:00 PM
Updated January 26, 2024
Site work for a water / sewer project in Olathe, Kansas. Completed plans call for site work for a water / sewer project.
Question & Answer deadline Jan 20, 2023 (Tue), 5:00 PM DESCRIPTION: It is the intent of this Request for Proposal (RFP) to identify a supplier/contractor to remove and replace all internal parts (except the flights, chains, and drives) in each of the four (4) Final Tanks at the Harold Street Wastewater facility (200 W Harold St Olathe, KS). The four Final Tanks were built and configured as two separate sets of two tanks. Bidders to field verify dimensions during the pre-bid review meeting. Additional details on the mechanism will be available at the pre-bid meeting and copies can be made at that time. SCOPE OF SERVICES The proposal must include all parts, fabrication, and installation labor for new final tank mechanisms except for flights, chains, and drive assemblies. The installation shall be performed one tank at a time, the total down time allowed per individual tank to complete all the work is limited to 2 weeks and only one tank can be out of service at a time. The installations will be phased based on budget availability. All work scheduling must be coordinated with City of Olathe staff. New parts and the tank may have to be modified to fit the new parts properly. Sprockets must be of similar size and teeth count and they must mount to the shaft similar to existing. Additional fabrication may be required as parts may be obsolete. All hardware cost is to be included in the proposal. Proposal pricing shall be separated into line items as follows: 1)Total Cost per tank a.Materials cost per tank b.Labor cost per tank 2)Total cost for 4 tanks a.Materials cost for 4 tanks b.Labor cost for 4 tanks Existing chain is Polychem brand. All sprockets shall be Polychem brand or other City approved brand that is compatible with Polychem brand chain.
Post-Bid
Water / Sewer
$590,000.00
Public - City
Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
Always Free
- Use filters and keyword searches to find valuable projects
- Get promoted to General Contractors and receive ITBs
- Access limited project details, bid dates, and locations
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
January 27, 2023
February 27, 2023
200 W Harold St, Olathe, KS
Related To This Project
Olathe, KS
Bid Date: Jan 24 2023
Olathe, KS
--
Olathe, KS
Bid Date: Apr 22 2025
Olathe, KS
Bid Date: Sep 13 2024
Olathe, KS
Bid Date: Jan 19 2023
Olathe, KS
Bid Date: Jan 24 2023
Olathe, KS
--
Olathe, KS
--
Olathe, KS
Bid Date: Feb 01 2023
Unlock the Full Project List
Access every active project near you — get started today.
- 825,000+ active commercial projects tracked daily
- Verified contact info for the GC, owner, and architect
- New leads delivered to your inbox every morning
Create your account to get started.
Takes less than a minute — no credit card needed