Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published April 21, 2023 at 8:00 PM
Updated January 14, 2025
Site work and outdoor lighting for a civil project in Westlock, Alberta. Completed plans call for site work for a road / highway; for outdoor lighting for a road / highway; and bridge / tunnel.
Grading, Granular Base Course, Cold Milling, Asphalt Concrete Pavement, Street Light Installation and Other Work 44:00 - S. of Twp. Rd. 594 to S. of Jct. Hwy. 18 kilometre 62.588 to 65.360 44:00 - Intersection Improvement at Jct. Hwy 44 & Twp. Rd. 594 Bridge Culvert Extension Installation and Other Work 44:00 - B.F. 77421 - Carrying Hwy. 44 over an Unnamed Watercourse, 4 km S. of Westlock Grading, Granular Base Course, Asphalt Concrete Pavement and Other Work 44:00 - N. of Jct. Hwy. 16 to S. of Jct. Hwy. 18 kilometre 6.949 to 9.000 (NBL) kilometre 4.175 to 6.340 (SBL) kilometre 17.160 to 19.560 (NBL) kilometre 56.718 to 59.100 (SBL) Grading, Granular Base Course, Asphalt Concrete Pavement, Street Light Installation and Other Work 44:00 - Intersection Improvements at Jct. Hwy. 44 & Twp. Rd. 540, Jct. Hwy. 44 & Twp. Rd. 571, Jct. Hwy. 44 & Westlock County Industrial Park Access 37:02 - Intersection Improvement at Jct. Hwy. 37 & Hwy. 779 Street Light Installation and Other Work 44:00 - Street Light Upgrades at Jct. Hwy. 44 & Hwy. 633 North Central Region APPROXIMATE QUANTITIES ROADWAY: 181 880 tonnes Supply of Aggregate - No Dept. Source Option 181 500 cubic metres Excavation 7 600 cubic metres Borrow Excavation - Designated Dept. Source 13 400 cubic metres Borrow Excavation - Contractor Supplied 120 510 tonnes Granular Base Course - Des. 2 Class 25 40 620 square metres Cold Milling (Various Depths) 58 400 tonnes Asphalt Concrete Pavement EPS Mix Type H2 (PG 64-37) ILLUMINATION: 478 metres Trenching and Backfilling 154 metres Underground Electrical Conduit - Pushed 614 metres Secondary Cable 14 units LED Fixture on Existing Standard - Supply and Install 7 units Street Light Standard - Supply and Install 3 units Distribution Enclosure CULVERT EXTENSION: 490 cubic metres Excavation 27 metres CSP Culvert 170 cubic metres Backfill - Granular 310 cubic metres Crushed Aggregate 30 cubic metres Heavy Rock Riprap Contractor to supply all materials. *Award granted
Award
Roads / Highways
$19,181,318.00
Public - State/Provincial
Outdoor Lighting, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 17, 2023
April 18, 2023
Multiple Locations, Westlock, AB
Related To This Project
Westlock, AB
Bid Date: Mar 28 2023
Westlock, AB
Bid Date: Mar 31 2023
Westlock, AB
Bid Date: Mar 30 2023
Westlock, AB
Bid Date: Apr 12 2023
Westlock, AB
Bid Date: Apr 28 2023
Westlock, AB
Bid Date: Jun 13 2023
Westlock, AB
Bid Date: Jun 13 2023
Westlock, AB
Bid Date: Aug 09 2022
Westlock, AB
Bid Date: Apr 25 2022
Westlock, AB
--
Westlock, AB
Bid Date: Apr 28 2022
Westlock, AB
Bid Date: Apr 25 2022
Fort Chipewyan, AB
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
