EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 4, 2023 at 8:00 PM

Updated January 26, 2024

Renovation of a municipal facility in Gaithersburg, Maryland. Working plans call for the renovation of a municipal facility.

***THIS REQUIREMENT IS HEREBY CANCELLED IN FULL*** The Government anticipates awarding a single firm fixed price purchase in accordance with the procedures outlined in FAR 13 - Simplified Acquisition Procedures. SCOPE OF REQUIREMENT Scope of Work: The scope of work includes the following: 22W2129 Building 216 Room F121 Laser System Installation 1. The contractor shall provide and install a laser safety central control panel and all associated equipment/devices in the existing stainless-steel enclosure/box between F121 and the corridor. 2. The contractor shall provide and install a door entry box with "time activated delay" key switch and associated orange indicating light at the general corridor entrance to F121. The contractor shall provide new 3/4" EMT conduits and support accessories. 3. The contractor shall provide and install a door entry box with "time activated delay" key switch and associated orange indicating light at the service galley entrance to F121. The contractor shall provide new 3/4" EMT conduits and support accessories. 4. The contractor shall provide and install a door entry box with "time activated delay" key switch and associated orange indicating light at the entrance to F121 from F115. The contractor shall provide new 3/4" EMT conduits and support accessories. 5. The contractor shall provide and install a control box inside the room installed on the corridor wall with key switch to turn system on, red light to indicate system is on, red button to power system off, and "time activated delay" key switch with associated orange indicating light. The contractor shall provide new 3/4" EMT conduits and support accessories. The scope of this project is to perform construction of building 216 Laser System Installation project as outlined in the DRAFT Statement of Work. All work shall be performed at the NIST campus located at 100 Bureau Drive, Gaithersburg, MD 20899. The magnitude for this project is estimated to be below $100,000.00. The Government will conduct a pre-quotation site visit, during which potential quoters may obtain a better understanding of the required work and view the location of the services on the NIST campus. The site visit will be held on Monday, February 6, at 9:00 AM Eastern Time . The site visit shall begin promptly at 9:00 AM located at NIST 100 Bureau Drive, Building 101, Gaithersburg, MD. Parties interested in attending the pre-quotation site visit must submit a written request to Jillian Staskin, Contracting Officer, via email at jillian.staskin@nist.gov, with the company name, address, name, and title of persons attending not later than February 1, 2023, at 10:00 AM Eastern Time . Please limit attendees to two individuals per company. The Contracting Officer will provide a written response confirmation receipt of the request. Following the site visit, quoters shall submit Requests for Information by February 9, 2023, at 12:00 PM EST. A solicitation amendment will be posted at www.sam.gov with questions and responses on or about February 16, 2023. In no event shall failure to attend the pre-quotation site visit constitute grounds for a pre-award or post-award protest and/or contract claim. Quoters are cautioned that, notwithstanding any remarks, clarifications, or responses provided at the site visit, all terms and conditions of the solicitation remain unchanged unless they are changed by written amendment. It is the responsibility of each quoter to seek clarification of any perceived ambiguity in the solicitation or created by an amendment to the solicitation. Period of performance for this SOW shall be 110 days after notice to proceed. Location: 100 Bureau Drive, Gaithersburg MD

Final Planning

Municipal

$100,000.00

Public - Federal

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

16

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Project Management and Coordination, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, References, Definitions, Quality Assurance, Mockups, Quality Control, Testing and Inspecting Services, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Cleaning and Waste Management, Progress Cleaning, Final Cleaning, Closeout Procedures, Closeout Submittals, Bonds, Project Record Documents, Commissioning
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Clay Unit Masonry, Concrete Unit Masonry, Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Cold-Formed Metal Framing, Metal Fabrications
Division 08 - Openings

Division 08 - Openings

Windows, Aluminum Windows, Bronze Windows, Stainless-Steel Windows, Steel Windows, Hardware, Louvers and Vents, Vents
Division 09 - Finishes

Division 09 - Finishes

Flooring, Wood Flooring, Resilient Flooring, Painting and Coating
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Signage, Interior Specialties, Compartments and Cubicles, Cubicles, Safety Specialties, Fire Protection Specialties, Fire Extinguishers
Division 11 - Equipment

Division 11 - Equipment

Vehicle and Pedestrian Equipment, Parking Control Equipment, Pedestrian Control Equipment, Turnstiles
Division 12 - Furnishings

Division 12 - Furnishings

Furniture
Division 13 - Special Construction

Division 13 - Special Construction

Special Purpose Rooms, Controlled Environment Rooms, Clean Rooms
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Elevators, Escalators and Moving Walks
Division 21 - Fire Suppression

Division 21 - Fire Suppression

Fire Suppression, Water-Based Fire-Suppression Systems, Facility Fire-Suppression Water-Service Piping, Fire-Suppression Sprinkler Systems, Water Spray Fixed Systems, Fire Pumps
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping, Plumbing Insulation
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, HVAC Insulation, HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Pumps, HVAC Air Distribution, HVAC Ducts and Casings, Metal Ducts, Air Duct Accessories, Dampers, HVAC Fans, Ventilation Hoods, Fume Hoods
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Low-Voltage Electrical Distribution, Low-Voltage Distribution Equipment, Wiring Devices, Facility Electrical Power Generating and Storing Equipment, Packaged Generator Assemblies, Electrical and Cathodic Protection, Facility Lightning Protection, Lighting, Emergency Lighting
Division 27 - Communications

Division 27 - Communications

Audio-Video Communications, Audio-Video Systems
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security, Electronic Detection and Alarm, Fuel-Gas Detection and Alarm, Electronic Monitoring and Control, Electronic Detention Monitoring and Control Systems
Division 31 - Earthwork

Division 31 - Earthwork

Earth Moving, Grading
Division 33 - Utilities

Division 33 - Utilities

Communications Utilities, Communications Distribution

Find More Local Projects

Within 75 Miles of This Project
167
Active Projects
79
Bidding Soon
2,031
All Active Projects
841
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 24, 2023

May 5, 2023

img_map_placeholder

100 Bureau Dr, Gaithersburg, MD


Find. Bid. Win. Your Next Project Starts Here.

Get the right
data with Project Intelligence

Share with your network.

Laser Interlock System

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.