EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and asbestos abatement for a municipal facility in Paris, Kentucky. Completed plans call for site work for a municipal facility; and for asbestos abatement for a municipal facility.

The vendor will provide all labor, material and equipment to complete the asbestos abatement in the SCOPE OF WORK below. SCOPE OF WORK 1. Asbestos abatement - remove asbestos containing material (ACM) in piping wrap and floor tiles of Building 18. 2. REFERENCES: ASTI Project #NB938 Building 18 Report. 3. DESCRIPTION OF WORK: 3.1. All permits, notifications, licenses, and inspections, if required, shall be secured by the vendor. 3.2. Set up containment and negative air machines. 3.3. Repair 9X9 ACM tiles at the transition by installing approximately 35 linear feet of rubber transitions over tile and concrete in the janitorial area of Building 18M. 3.4. Remove approximately 90 square feet of 9X9 ACM tiles and mastic in hallway of 18M. 3.5. Remove approximately 400 linear feet of ACM pipe wrap above the ceiling tiles in Building 18. Clean all pipes of leftover residue. Clean and HEPA vac daily to ensure no cross contamination of asbestos fibers accrue during abatement. 3.6. After pipe wrap abatement, ensure air samples are below 0.1% by weight and install new 2X4 ceiling tiles back in the abatement area. Dispose of contaminated ceiling tiles in the abatement area. 3.7. Remove approximately 15 linear feet of ACM pipe wrap in the conference room maintenance closet. 3.8. Properly dispose of all ACM and contaminated materials in accordance with local, state, and federal laws. 3.9. The vendor shall follow all applicable EPA and OSHA regulations. 3.10. The vendor and all its employees must maintain a valid KY asbestos accreditation. 3.11. The vendor can expect normal work hours of 8:00 a.m. to 4:30 p.m., Monday through Friday. Any work required on weekends shall be coordinated with and approved by Bluegrass Station. 4. PERIOD OF PERFORMANCE: The period of performance shall commence at contract award and shall continue for sixty (60) consecutive days. Service Start : 1/30/2023 Service End : 3/30/2023

Award

Municipal

$27,670.00

Public - State/Provincial

Asbestos Abatement, Site Work

3

4

2

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
68
Active Projects
44
Bidding Soon
741
All Active Projects
269
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 20, 2023

January 30, 2023

img_map_placeholder

5751 Briar Hill Rd, Paris, KY


New Year, New Possibilities. Make the connections you need to kickstart 2025.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.