BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in White Swan, Washington. Completed plans call for site work for a water / sewer project.

As of September 12, 2024 project was awarded to RJS Construction, awarded amount is $313,452.65. Disconnection of an existing municipal well from the White Swan Community Water System. Installation of a municipal well pump, drop pipe, pitless adapter, piping, electrical wiring, automatic transfer switch, and appurtenances in order to bring an existing drilled municipal water well into service. 1. Schedule B: Well Pump and Accessories a) Disconnect existing Well #2 from Community Water System. Salvage existing Well #2 pump and drop pipe, and provide to the Nation. Chlorinate Well #2 after pump and drop pipe removal. Remove existing pitless unit and well cap. Weld plat with continuous bead 24 above finished grade with 2 NPT nipple and cap. b) Install pitless adapter, submersible well pump and electrical cable, drop pipe, level monitoring equipment as specified in Section 33 21 02. c) Install water distribution main and connect community well to the White Swan Water System as specified in Section 33 11 13. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Award

Water / Sewer

$313,453.00

Public - Federal

Site Work

8

13

8

3

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
21
Active Projects
7
Bidding Soon
188
All Active Projects
80
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 15, 2024

September 16, 2024

img_map_placeholder

221 A St, White Swan, WA


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.