BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 1, 2023 at 7:00 PM

Updated January 25, 2024

Site work and paving for a civil project in Worden, Illinois. Completed plans call for site work for a bridge / tunnel; for paving for a bridge / tunnel; road / highway; and road / highway.

Removal of an existing three-span structure and the construction of a new single-span wide flange steel beam bridge on concrete abutments with a steel H-piles, earthwork, riprap, concrete approach slabs, aggregate surface course, guardrail and incidental work as necessary. Channel Excavation - 906 CU YD Stone Riprap, Class A5 - 493 SQ YD Aggregate Surface Course, Type A - 113 TON Concrete Structures - 76.2 CU YD Concrete Superstructure - 99.8 CU YD Concrete Superstructure (Approach Slab) - 83.3 CU YD Furnishing and Erecting Structural Steel - 1 L Sum Reinforcement Bars, Epoxy Coated - 65,960 POUND Steel Railing, Type SM - 177 FOOT Furnishing Steel Piles HP 12x63 - 500 FOOT Project Location: On Possum Hill Road over Sherry Creek, 250' west of Quercus Grove Road City/County: Madison Proposals requiring prequalification of bidders will be issued only to those contractors who are qualified with the Department of Transportation. Prequalification forms may be secured from the Engineer of Construction, Administration Building, 2300 South Dirksen Parkway, Springfield, IL 62764. ILDOT - Removal of an Existing Three-span Structure and the Construction of a New Single-span Wide Flange Steel Beam Bridge - 21-00100-00-BR

Post-Bid

Bridges / Tunnels

$300,000.00

Public - County

Paving, Site Work

34

5

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
202
Active Projects
95
Bidding Soon
1,384
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 31, 2023

March 3, 2023

Project location map

Brandt Rd, Worden, IL

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.