Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work for a development in Rainier, Washington. Completed plans call for site work for a development.
Engineer's Estimate as a Range (Construction Only): $200,000 - $400,000 Location: Rainier, WA (Thurston County) Schedule: In-water work window: July 15 --- Sept 15, 2023, project end Oct. 15, 2023 Contact: Cole Baldino, Project Manager - coleb@spsseg.org, 360- 464-0004 Procedure: 1. Access the Eid Announcement and resource materials via the Drive Link. 2. Request access to be added to Roster List and access bid materials. 3. Access/view all resource materials in the Drive Folder. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. This project provides for construction of the Deschutes River RM 34.5 Restoration Project all in accordance with the attached plans and special provisions. The Project involves a construction of the following main elements: 1. Installation of thirty-eight (38) 45' long 18-24" diameter logs within the Deschutes River channel and floodplain on Weyerhaeuser property. 2. Installation of twenty-two (22) 35' long 18-24" diameter logs within the Deschutes River channel and floodplain on Weyerhaeuser property. 3. Installation of twenty (20) 25' long 12" diameter vertical logs within the Deschutes River floodplain on Weyerhaeuser property. 4. Installation of seventy-one (71) 20' long 6-12" diameter logs within the Deschutes River channel and floodplain on Weyerhaeuser property. 5. Installation of 14 threaded rod connection points between the above logs on Weyerhaeuser property. 6. Installation of 300 linear feet of flood fence on Weyerhaeuser property. 7. Installation of 380 linear feet of brush trench on Weyerhaeuser property. 8. 630 cubic years of channel excavation, haul and compact to create aquatic habitat and improve log stability on Weyerhaeuser property. 9. Harvest and Haul of logs to location of installation. 10. Planting by Owner/Sponsor. 11. Site restoration will be completed for all access and haul routes Note that sensitive areas have been noted on project plans and cannot be used for access and haul.
Award
Conservation and Development
$237,890.00
Public - State/Provincial
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 15, 2023
July 15, 2023
To Be Determined, Rainier, WA
Related To This Project
Rainier, WA
Bid Date: Feb 15 2023
Rainier, WA
Bid Date: Mar 28 2023
Rainier, WA
Bid Date: Jan 30 2024
Rainier, WA
Bid Date: Jul 26 2023
Rainier, WA
Bid Date: Jun 23 2021
Rainier, WA
Bid Date: Jun 29 2020
Rainier, WA
--
Spokane, WA
--
Pomeroy, WA
--
Renton, WA
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.