BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a development in Rainier, Washington. Completed plans call for site work for a development.

Engineer's Estimate as a Range (Construction Only): $200,000 - $400,000 Location: Rainier, WA (Thurston County) Schedule: In-water work window: July 15 --- Sept 15, 2023, project end Oct. 15, 2023 Contact: Cole Baldino, Project Manager - coleb@spsseg.org, 360- 464-0004 Procedure: 1. Access the Eid Announcement and resource materials via the Drive Link. 2. Request access to be added to Roster List and access bid materials. 3. Access/view all resource materials in the Drive Folder. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. This project provides for construction of the Deschutes River RM 34.5 Restoration Project all in accordance with the attached plans and special provisions. The Project involves a construction of the following main elements: 1. Installation of thirty-eight (38) 45' long 18-24" diameter logs within the Deschutes River channel and floodplain on Weyerhaeuser property. 2. Installation of twenty-two (22) 35' long 18-24" diameter logs within the Deschutes River channel and floodplain on Weyerhaeuser property. 3. Installation of twenty (20) 25' long 12" diameter vertical logs within the Deschutes River floodplain on Weyerhaeuser property. 4. Installation of seventy-one (71) 20' long 6-12" diameter logs within the Deschutes River channel and floodplain on Weyerhaeuser property. 5. Installation of 14 threaded rod connection points between the above logs on Weyerhaeuser property. 6. Installation of 300 linear feet of flood fence on Weyerhaeuser property. 7. Installation of 380 linear feet of brush trench on Weyerhaeuser property. 8. 630 cubic years of channel excavation, haul and compact to create aquatic habitat and improve log stability on Weyerhaeuser property. 9. Harvest and Haul of logs to location of installation. 10. Planting by Owner/Sponsor. 11. Site restoration will be completed for all access and haul routes Note that sensitive areas have been noted on project plans and cannot be used for access and haul.

Award

Conservation and Development

$237,890.00

Public - State/Provincial

Site Work

15

6

4

4

Subscribe For Documents

27 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
63
Active Projects
41
Bidding Soon
674
All Active Projects
234
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 15, 2023

July 15, 2023

img_map_placeholder

To Be Determined, Rainier, WA

The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.