Demolition, site work, paving and new construction of a civil project in Valparaiso, Indiana. Completed plans call for site work for a bridge / tunnel; for paving for a bridge / tunnel; for the demolition of a bridge / tunnel; and for the construction of a bridge / tunnel.

Project Control No. 1701331, 1701332, 1701442, 1701443, 1701444, 1701472, 1701509, 2001036, 2100944, 2100947 Federal/State No. 170133100ST4, 170133200ST4, 170144200ST4, 170144300ST4, 170144400ST4, 170147200ST4, 170150900ST4, 200103600ST4, 210094400ST4, 210094700ST4 Small Structure Pipe Lining Cv 020-064-27.04 Culvert Porter County - on Us 20, 0.80 Mile East of Sr 149 (Rp 027+0004) Small Structure Extension Cv 030-045-004.01 Culvert Lake County - on Us 30, 1.13 Miles East of Us 41 (Rp 004+0001) Small Structure Pipe Lining Cv 020-064-23.50 Culvert Porter County - on Us 20, 2.74 Miles West of Sr 149 (Rp 023+0005) Small Structure Replacement Cv 020-064-26.50 Continuous Reinforced Concrete Box Porter County - on Us 20, 0.36 Mile East of Sr 149 (Rp 026+0005) Small Structure Pipe Lining Cv 231-045-292.55 Culvert Lake County - on Us 231, 1.50 Miles West of Sr 55 (Rp 292+0055) Small Structure Replacement Cv 312-045-5.10 Culvert Lake County - on Sr 312, 0.01 Mile West of Sr 912 (Rp 005+0001) Small Structure Replacement Cv 231-045-294.60 Culvert Lake County - on Us 231, 3.50 Miles West of Sr 55 (Rp 294+0006) Bridge Deck Overlay 049-64-06684 Continuous Steel Box Girder Porter County - on Calumet Avenue Over Sr 49, 1.02 Miles South Us 6 (Rp 035+0090) Small Structure Maintenance and Repair Cv 041-045-254.35 Culvert Lake County - on Us 41 Over Unt of West Creek, 4.00 South of Us 231 (Rp 254+0035) Small Structure Maintenance and Repair Cv 041-045-256.70 Culvert Lake County - on Us 41 Over Unt of West Creek, 1.74 Miles South of Us 231 (Rp 256+0070) Contractors desiring to submit electronic bids via Electronically must register with INDOT as a valid bidder by submitting the form provided on the INDOT Letting Information internet page. Failure to register will cause failure of the Electronic bid submission process. A bidder may request valid bidder status by submitting the bidder registration form until 9:00 AM on the bid opening date. An executed bid bond shall be included with all bids. Only electronic bid bonds submitted through the designated electronic medium, either Surety2000 or Tinubu Surety Solution, will be accepted with the bid. A fully executed performance bond shall be included with all bids, except on contracts for roadside mowing, vegetation control, demolition, landscaping, fencing, seeding and sodding, bridge painting, and guardrail installations of $100,000 or less, when the bidder may elect not to furnish a performance bond. Electronically does not support submittal of the performance bond. The performance bond must be submitted to the Construction Letting email inbox or be delivered on paper by the time set for receipt of proposal bids. Each contractor that submits a proposal bid in the amount of $150,000 or more for highway improvements described in this notice is required to submit with that bid a written plan for a program to test the contractor's employees for drugs. The plan shall be in compliance with Indiana Code 4-13-18. The plan must be submitted to the Construction Letting email inbox or deposited with the INDOT Prequalification Engineer by the time set for receipt of proposal bids. INDOT - Call 401 - Small Structure Replacement

Award

Bridges / Tunnels

$5,556,759.00

Public - State/Provincial

Demolition, New Construction, Paving, Site Work

280

6

5

Subscribe For Documents

20 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Administrative Requirements, Submittal Procedures, Design Data, Special Procedures, Alteration Project Procedures, Quality Requirements, Regulatory Requirements, Temporary Facilities and Controls, Temporary Utilities, Temporary Lighting, Temporary Construction, Temporary Runarounds, Vehicular Access and Parking, Temporary Access Roads, Traffic Control, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Erection, Cleaning and Waste Management, Closeout Submittals, Warranties
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing, Reinforcing Steel, Cast-in-Place Concrete, Structural Concrete, Precast Concrete, Precast Structural Concrete
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Clay Unit Masonry, Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing, Metal Fabrications, Metal Castings
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Dampproofing and Waterproofing
Division 08 - Openings

Division 08 - Openings

Hardware, Glazing, Glass Glazing
Division 09 - Finishes

Division 09 - Finishes

Tiling, Painting and Coating
Division 10 - Specialties

Division 10 - Specialties

Other Specialties, Scales
Division 11 - Equipment

Division 11 - Equipment

Vehicle and Pedestrian Equipment, Parking Control Equipment
Division 12 - Furnishings

Division 12 - Furnishings

Furnishings and Accessories, Bedroom Furnishings, Blankets, Multiple Seating, Pews and Benches, Benches
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Dumbwaiters, Lifts
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Pumps, HVAC Air Distribution, HVAC Ducts and Casings
Division 26 - Electrical

Division 26 - Electrical

Lighting
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Geosynthetics for Earthwork, Site Clearing, Earth Moving, Grading, Excavation and Fill, Excavation, Dewatering, Fill, Backfill, Compaction, Embankments, Erosion and Sedimentation Controls, Earthwork Methods, Soil Stabilization, Shotcrete Soil Slope Stabilization, Shoring and Underpinning, Shoring, Sheet Piling, Special Foundations and Load-Bearing Elements, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Common Work Results for Exterior Improvements, Bases, Ballasts, and Paving, Paving Specialties, Pavement Markings, Site Improvements, Retaining Walls, Planting, Planting Preparation, Mulching, Turf and Grasses, Seeding, Plants, Trees
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities, Water Utilities, Water Utility Distribution Piping, Storm Drainage Utilities, Culverts, Pipe Culverts
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment, Coastal Construction, Shoreline Protection, Waterway Construction and Equipment, Waterway Scour Protection
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Piece Material Handling Equipment, Lifting Devices, Clamps, Lifts, Manufacturing Equipment, Dies and Molds, Molds
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
177
Active Projects
97
Bidding Soon
2,059
All Active Projects
770
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 10, 2023

July 10, 2023

img_map_placeholder

Multiple Locations, Valparaiso, IN

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.