BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published March 7, 2023 at 7:00 PM

Updated March 22, 2024

Demolition, site work, paving and new construction of a bridge / tunnel in Chicopee, Massachusetts. Completed plans call for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

Connecticut River Mainline Steel Bridge Repair/Rehabilitation for Bridges 3.60 & 7.97 in Chicopee & Holyoke, MA (612783) This project has a MBE/WBE goal of 5% for the work performed under this Contract.

Post-Bid

Bridges / Tunnels

$2,800,000.00

Public - State/Provincial

Demolition, New Construction, Paving, Site Work

16

18

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
200
Active Projects
2
Bidding Soon
2,533
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 3, 2023

March 24, 2023

Project location map

Multiple Locations, Chicopee, MA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.