BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 14, 2025 at 8:00 PM

Updated July 15, 2025

Site work, paving and outdoor lighting for a mixed-use development in Bend, Oregon. Completed plans call for site work for a playground / park / athletic field; for outdoor lighting for a playground / park / athletic field; and for paving for a playground / park / athletic field.

Gc for Pine Nursery Phase 5 Project. Overall project scope: The Pine Nursery Phase 5 Project includes various work to complete a number of items for the park master plan. Multiple components of the park have been constructed in past years and this work will connect or complete a number of previous phases. Work for Phase 5 includes the addition of ball field lighting, artificial turf infields, additional sports courts, additional access and pathways, facilities for maintenance, changes to the dog park, mechanical and electrical utilities, as well as landscaping and irrigation. This work shall include all work necessary to complete the work as described in the drawings and documents. B. Caution shall be used at areas adjacent to existing park and landscape features, minimum limits shall be used at perimeter areas to avoid disruption to the existing landscape and hardscape areas. The contractor shall be responsible to repair and replace any and all damage done to adjacent areas; all repairs shall be completed to the satisfaction of the District. C. The contractor shall maintain adequate erosion control measures, as well as temporary access control to the site at all times during the construction period. Temporary access control shall be by construction fencing made of chain link, and a minimum of 6í-0î in height. The site shall be secured by padlock when active work is not being done. Pine Nursery Park is an actively used park by members of the general public; it shall be the contractorís responsibility to protect the construction zone from the public during the construction period. In addition, as Pine Nursery is an active park, work is to be sequenced in a manner to allow the use of park features and amenities to the greatest extent possible throughout construction. Athletic Field use is scheduled such that work may not commence on those components until 10/27/2025. Question Deadline 07/04/2025 Technical questions regarding the project, or requests for clarification or change, should be directed to Jason Powell, at 541-706-6158 and must be received at least five (5) days prior to Bid Date and Time. Procurement Substitution requests must be received at least seven (7) days prior to the Bid Date and Time.

Bid Results

Playgrounds / Parks / Athletic Fields

$5,273,142.00

Public - City

Outdoor Lighting, Paving, Site Work

123

26

15

3

Subscribe For Documents

28 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
15
Active Projects
6
Bidding Soon
120
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.