BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a pre-engineered storage facility in Altus, Oklahoma. Working plans call for the renovation of a pre-engineered storage facility.

Project was cancelled and no specific date for rebid. This project involves the following elements. Bids shall provide design, labor, equipment, materials and incidentals needed to perform the following work: 1. Install 5-ton residential heater and air conditioner. The furnace can be electric or gas. This shall serve the office space of 1,500 ft2 with 8 ft drop ceiling. Locate thermostat in hallway between breakroom and office. 2. Size and install package unit to heat and cool storage bay and service bays (10,500 ft2 with 20-25 ft ceilings. Units to be locate on concrete pad on the west side of the building. 3. Size gas line for both HVAC units if needed. This price shall include installation of gas service lines (if needed). 4. Run single duct from package unit 15 ft up the wall and 165 feet across service bays as shown. Interior duct to be 20 ft above the floor. Exterior duct to be insulated. Contractor to determine size and material of all ducts. 5. Install explosion-proof ventilation as required for 40-ft long oil change pit, 42 inches wide and 7 feet deep. Provide minimum of 4 air changes per hour. Provide two wall switches one inside trench and one outside. Size pipe and blower. 6. Size and install three ventilation fans on north wall, 15 ft above floor in Service Bays 1, 3 and 5 with wall-mounted switches. Three switches, each switch to operate all three fans.The City reserves the right to reject any or all bids and to study all bids for thirty (30) days prior to bid award. The City reserves the right to award this bid in whole or in part as deemed in the best interest of the City.Technical questions regarding this solicitation must be submitted by 3:00 PM on Thursday, February 16, 2023 to the City Engineer who can be reached as follows: Johnny Barron City Engineer 580-481-3518 jbarron@altusok.gov

Final Planning

Warehouse / Distribution - Pre-Engineered Storage Building

$200,000.00

Public - City

Renovation

7

5

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
26
Active Projects
14
Bidding Soon
188
All Active Projects
97
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

February 22, 2023

September 11, 2023

August 21, 2023

img_map_placeholder

To Be Determined, Altus, OK

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.