Site work and renovation of a civil project in Peters Township, Pennsylvania. Completed plans call for the renovation of a water / sewer project; and for site work for a water / sewer project.

As of March 24, 2023, project was awarded to Guyer Brothers, Inc., awarded amount is $2,640,950.68. For Phase 1 Water System Improvement Project Groundwater Source Development Contract No. 1: Waterline Work The project consists of installation of approximately 1 5,000 LF of raw water transmission lines and all associated appurtenances. Bidders are advised that this project is being financed by the Pennsylvania Infrastructure Investment Authority (PENNVEST). The attention of the Bidders is also directed to the Disadvantaged Business Enterprise (DBE) and the Super Cross Cutter Requirements for Construction Projects funded under the PennVEST Clean Water and Drinking Water State Revolving Fund loan programs. Bidders must submit DBE contact and commitment documentation with the Bid. Funding for this project originates from USEPA financial assistance dollars. Therefore, all contractors must demonstrate compliance with federal Executive Orders 11625, 12138 and 12432 and EPA Regulations at 40 CFR Part 33, through the detailed documentation of solicitation of Disadvantage Business Enterprises (DBEs). Contractors must demonstrate the Six Good Faith Efforts to identify and solicit DBE firms that are potential sources for any procurement action in the areas of project construction, equipment, services and supplies by including state qualified small businesses and minority and women owned business enterprises in the bidding process. Notice is given that not less than the minimum wage rates set forth in the Contract Documents must be paid to employees on this project in accordance with the US Department of Labor Davis-Bacon Wage Rates. The project must comply with the Pennsylvania Steel Products Procurement Act and American Iron and Steel (AIS) Act as amended, Build America, Buy America Requirements and Infrastructure Investment and Jobs Act. The Contractor is subject to the provisions of the Pennsylvania Steel Products Procurement Act of 1978, P.L. 6, as amended as well as American Iron and Steel Requirements as amended. The Act and amendments require that the Contractor use or furnish only steel products (as defined in the Act and amendments) which have been produced in the United States. Each bid must be accompanied by a Certified or Bank Check; or Bid Bond naming as payee or obligee (as applicable), the Bear Valley Franklin County Pennsylvania Joint Authority, in the amount of five percent (5%) of the total amount of the bid as security for proper execution of the Agreement and submitting other documents as required by the Bidding Documents. No bids may be withdrawn, except when the Bidder(s) comply with the withdrawal requirements of Act No. 4 of the General Assembly of Pennsylvania, Senate Bill 793, Printers No. 1655, as amended. The Successful Bidder will be required to execute the Agreement and to furnish a performance and payment bonds, each of said bonds to be in the amount of one hundred percent (100%) of the Contract Price, all in the respective forms provided in the Bidding Documents. The Contractor also will be required to furnish evidence of insurance coverage as required by the Bidding Documents. All bonds shall be executed by sureties named in "Circular 570 - Companies Holding Certificates of Authority as Acceptable Sureties in Federal Bonds and as Acceptable Reinsuring Companies" (current publication) by the Audit Staff, Bureau of Government Financial Operations, U.S. Treasury Department. Bear Valley Joint Authority reserves the right to reject any or all bids or parts thereof or items therein, to waive any defects or irregularities in the Bids, and to accept any Bid which, in its judgment, is for its best interest. Bids shall remain open for a period of sixty (60) days from the date of Bid opening unless award is delayed by a required approval from a governmental agency, the sale of bonds, or the award of a grant or grants, in which event the Bids shall remain open for a period of one hundred twenty (120) days from the date of Bid opening Site Visit: Owner will not have any obligation to grant such access if doing so is not practical because of existing operations, security or safety concerns, or restraints on Owner's authority regarding the Site.

Award

Water / Sewer

$2,640,951.00

Public - County

Renovation, Site Work

52

19

13

6

Subscribe For Documents

20 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Summary, Summary of Work, Work by Owner, Price and Payment Procedures, Allowances, Cash Allowances, Contract Modification Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, References, Reference Standards, Quality Assurance, Field Samples, Quality Control, Testing Laboratory Services, Temporary Facilities and Controls, Vehicular Access and Parking, Traffic Control, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Erection, Cleaning and Waste Management, Closeout Submittals, Maintenance Data, Bonds, Warranties, Project Record Documents, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Subsurface Investigation, Exploratory Excavations
Division 03 - Concrete

Division 03 - Concrete

Concrete Reinforcing, Reinforcing Steel, Welded Wire Fabric Reinforcing
Division 04 - Masonry

Division 04 - Masonry

Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Metal Fabrications, Metal Castings
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Architectural Woodwork
Division 08 - Openings

Division 08 - Openings

Hardware, Glazing, Glass Glazing
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Tiling, Painting and Coating
Division 12 - Furnishings

Division 12 - Furnishings

Furniture, Seating
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Lifts
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping, Vibration and Seismic Controls for Plumbing Piping and Equipment
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, Vibration and Seismic Controls for HVAC Piping and Equipment, HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Pumps
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Site Clearing, Earth Moving, Grading, Excavation and Fill, Excavation, Trenching, Dewatering, Fill, Backfill, Compaction, Embankments, Erosion and Sedimentation Controls, Special Foundations and Load-Bearing Elements, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Base Courses, Concrete Base Courses, Rigid Paving, Concrete Paving, Curbs and Gutters, Paving Specialties, Pavement Markings, Plastic Pavement Markings, Planting, Planting Preparation, Mulching, Turf and Grasses, Plugging, Seeding, Plants, Shrubs, Trees
Division 33 - Utilities

Division 33 - Utilities

Utilities, Operation and Maintenance of Utilities, Common Work Results for Utilities, Water Utilities, Water Utility Distribution Piping
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Piece Material Handling Equipment, Cranes and Hoists, Lifting Devices, Clamps, Hooks, Lifts, Mobile Plant Equipment, Mobile Earth Moving Equipment, Compactors
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
124
Active Projects
66
Bidding Soon
1,097
All Active Projects
518
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 22, 2023

April 24, 2023

img_map_placeholder

Multiple Locations, Peters Township, PA

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Phase I Water System Improvement Project Groundwater Source Development Contract No. 1: Waterlines

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.