BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a mixed-use development in Rutland, Vermont. Conceptual plans call for site work for a transportation facility.

The City of Rutland is requesting proposals for engineering services for a project to construct comprehensive upgrades to the area surrounding the Rutland Train Station to create a regional, multi-modal transportation hub funded in part by the Federal Highway Administration and the City of Rutland, through the Vermont Agency of Transportation (VTrans) Municipal Assistance Section (MAS). The project is managed locally by Steffanie Bourque, Municipal Project Manager. The owner of the project is the City and the ultimate authority for the design engineering consultant during the project rests with the Rutland City Mayor, through its Municipal Project Manager. The City of Rutland has entered into an agreement with the Vermont Agency of Transportation to develop a project to revitalize the area surrounding the Train Station in downtown Rutland. The revitalization project will create a regional, multi-modal transportation hub, supporting the Ethan Allen passenger rail extension to Burlington, by 1) expanding parking, transit, and bicycle/pedestrian amenities; 2) improving bicycle/pedestrian safety; and 3) enhancing the gateways aesthetics and traffic safety with green stormwater infrastructure and landscaping. The Train Station has no direct pedestrian connections, experiences unsafe driving, and lacks any public transit connections. To address these needs, the proposed project will include: 1) New sidewalk from the Train Station to Evelyn Street, including crosswalk connection(s) to the existing Downtown and Plaza pedestrian network; 2) Added curbed green buffers; 3) Expanded lighting and fencing; 4) New bus shelter and bicycle parking; and 5) Possible conversion of Evelyn Street to one-way access. The concept for this project was highlighted as a transportation priority in the 2020 Downtown Rutland Strategic Plan. An extensive planning and review process to develop a conceptual design (see attached) was completed in 2021 with stakeholders from VTrans, Vermont Rail Systems, Amtrak, Marble Valley Regional Transit District, Brixmor Property Group, and Rutland City. Note that in the fall of 2022, a 12-foot sculpture of a locomotive was installed within the project limits, which is not shown on the attached 2021 conceptual design. This project is funded in part by the Federal Highway Administration and the Vermont Agency of Transportation. Accordingly, all aspects of project development, from developing a purpose and need statement to constructing the project, must conform to federal and state regulations. In general, the scope of this project will consist of an abbreviated scoping phase, building on the work completed in 2021, and the development of Conceptual Plans through Contract Plans, Specifications and Estimates. The design phase will follow the development process used by the VTrans Municipal Assistance Section as follows: Project kick-off and development of conceptual plans. Submission of documentation and plans for NEPA process. Development of preliminary plans. Develop Right of Way (ROW) plans, if necessary, and assist with ROW documents. Develop contract plans, technical specifications, final engineers estimate and bid documents and assist with the bidding process. Assistance during construction. The method of contractor selection has not been determined at this time. As of January 31, 2023, the due date and time has been confirmed with the owner.

Conceptual

Transportation Terminals

$1,000,000.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
109
Active Projects
42
Bidding Soon
878
All Active Projects
388
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 11, 2024

img_map_placeholder

Multiple Locations, Rutland, VT

Related To This Project


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.