BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 3, 2024 at 8:00 PM

Updated October 4, 2024

Site work and paving for a mixed-use development in Summerfield, North Carolina. Design plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; water / sewer project; and water / sewer project.

As of October 3, 2024, this project is in the design phase. A timeline for construction has not yet been established. Previous solicitation listed below for reference: The Town of Summerfield desires to engage pre-qualified engineering firms ("PEF") to provide late-stage planning and engineering services for its planned Atlantic and Yadkin (A&Y) Greenway. This 3.62-mile project runs from the US-220 pedestrian tunnel to Medearis Street and its NC Department of Transportation (NCDOT) project number is TIP #EB-5900. The initial design and engineering firm (Stewart) developed this project to approximately the 75% design stage and the pre-construction environmental document is currently being reviewed by NCDOT. Stewart was not able to complete the remaining planning and engineering and the town is seeking a PEF to complete the remaining work. Right-of-way work is needed in 2023 in order for construction to start in 2024. The town is working closely with both NCDOT and Greensboro Urban Area Metropolitan Planning Organization (GUAMPO) to bring this important area project to fruition. REQUIREMENTS FOLLOWING AWARD OF SERVICE CONTRACT: 1. Vendor must have a current $1,000,000 general liability insurance policy naming the Town of Summerfield as an additional insured party. 2. If applicable, awarded vendor will provide a current Workman's Compensation insurance policy, naming the Town of Summerfield as an additional insured party. 3. Vendor must provide the following: Certificate of Insurance and W-9. If you do not have worker's compensation insurance, you must complete an Independent Contractor Agreement and Independent Contractor vs. Employee Checklist. 4. Vendor must provide a Sales Tax Certification form upon invoice submission. ________________________________________________________________________

Design

Sidewalks / Parking Lot

$560,000.00

Public - City

Paving, Site Work

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
307
Active Projects
169
Bidding Soon
2,156
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 3, 2025

Project location map

Multiple Locations, Summerfield, NC

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.