Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published October 3, 2024 at 8:00 PM
Updated October 4, 2024
Site work and paving for a mixed-use development in Summerfield, North Carolina. Design plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; water / sewer project; and water / sewer project.
As of October 3, 2024, this project is in the design phase. A timeline for construction has not yet been established. Previous solicitation listed below for reference: The Town of Summerfield desires to engage pre-qualified engineering firms ("PEF") to provide late-stage planning and engineering services for its planned Atlantic and Yadkin (A&Y) Greenway. This 3.62-mile project runs from the US-220 pedestrian tunnel to Medearis Street and its NC Department of Transportation (NCDOT) project number is TIP #EB-5900. The initial design and engineering firm (Stewart) developed this project to approximately the 75% design stage and the pre-construction environmental document is currently being reviewed by NCDOT. Stewart was not able to complete the remaining planning and engineering and the town is seeking a PEF to complete the remaining work. Right-of-way work is needed in 2023 in order for construction to start in 2024. The town is working closely with both NCDOT and Greensboro Urban Area Metropolitan Planning Organization (GUAMPO) to bring this important area project to fruition. REQUIREMENTS FOLLOWING AWARD OF SERVICE CONTRACT: 1. Vendor must have a current $1,000,000 general liability insurance policy naming the Town of Summerfield as an additional insured party. 2. If applicable, awarded vendor will provide a current Workman's Compensation insurance policy, naming the Town of Summerfield as an additional insured party. 3. Vendor must provide the following: Certificate of Insurance and W-9. If you do not have worker's compensation insurance, you must complete an Independent Contractor Agreement and Independent Contractor vs. Employee Checklist. 4. Vendor must provide a Sales Tax Certification form upon invoice submission. ________________________________________________________________________
Design
Sidewalks / Parking Lot
$560,000.00
Public - City
Paving, Site Work
We’ve obtained documents for this project and are currently processing them.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 3, 2025
Multiple Locations, Summerfield, NC
Related To This Project
Summerfield, NC
Bid Date: Jan 02 2024
Summerfield, NC
--
Summerfield, NC
Bid Date: Oct 22 2020
Summerfield, NC
--
Summerfield, NC
--
Summerfield, NC
--
Summerfield, NC
Bid Date: Oct 09 2025
Summerfield, NC
Bid Date: Sep 23 2025
Summerfield, NC
Bid Date: Jul 07 2022
Summerfield, NC
--
Raleigh, NC
--
Haw River, NC
--
Butner, NC
Bid Date: Jan 26 2023
Charlotte, NC
Bid Date: Feb 14 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
