BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 20, 2025 at 8:00 PM

Updated June 21, 2025

Site work and paving for a road / highway in Tahoe City, California. Design plans call for site work for a road / highway; and for paving for a road / highway.

As of June 20 2025 this is in early prelim design, and should start in 2027/2028 at earliest, an award has been made for this solicitation. Closed solicitation has been included below for reference. The County of Placer is soliciting proposals from qualified firms to provide Preliminary Engineering and Environmental Document Preparation services for the Flick Point II Water Quality and Ecosystem Improvement Project, a multi-benefit project in the Carnelian Bay area of North Lake Tahoe, in the vicinity of Flick Point. The project improvements will consist of a paved shared-use trail segment, water quality improvements in the adjacent residential neighborhood, and Stream Environment Zone (SEZ) restoration work. This RFP will result in the award of a contract to a single firm for this preliminary work. However, the County reserves the option to contract with the selected firm for future related tasks for this project, up to and including Final Design and Preparation of Plans and Specifications, and Bid and Construction Assistance. Therefore, the County will select the firm who is most qualified to perform all applicable engineering design and project support services for this project PROJECTS FUNDED Projects funded in this grant cycle feature improvements to portions of the Resort Triangle Trail, including the Martis Valley Trail ($2 million), Flick Point II Trail ($70,000) and the North Tahoe Trail ($1.5 million). Additional dirt trails and amenities were also funded including Sawtooth Trail ($157,983), Donner Lake Rim Trail ($265,000) and Cabin Creek trailhead amenities ($91,694). Both North Tahoe Public Utilities District ($58,141) and Tahoe City Public Utilities District ($351,000) received funding to enhance community signage projects.

Design

Roads / Highways

$70,000.00

Public - County

Paving, Site Work

Our team is requesting plans for this project.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
172
Active Projects
72
Bidding Soon
985
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 15, 2028

Project location map

To Be Determined, Tahoe City, CA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.