Site work and asbestos abatement for a bridge / tunnel in Binghamton, New York. Completed plans call for site work for a bridge / tunnel; and for asbestos abatement for a bridge / tunnel.

As of April 17, 2023, this project has not yet been awarded. A timeline for award has not yet been established. The work of this single bid project includes replacing two sections of the Campus-wide high temperature hot water distribution system. The scope of work will remove and replace a section of piping in an existing box tunnel and a section of direct buried piping. The work will also include hazardous material abatement. All bidders must present evidence of skill, experience and financial qualifications per Information to Bidders, Section 7 of the project specs. Subcontracting is permitted (Section 2.18 of SUCF Agreement). Principal subcontractors must be named within 48 hrs after bid opening per Information for Bidders Section 8. Bidders must submit within 48 hrs. either certification of its NYS VendRep questionnaire (preferred) or a signed and notarized paper CCA2 form (Version 9/13 only), Attachments A, B, and C, Appendix A form, work descriptions, and preliminary project schedule. In accordance with State Finance Law 139-j, all non-technical inquiries regarding this procurement must be directed to Robbilee Luedtke at SUCF.ConstructionBids@suny.edu or for MWBE related issues, Scott Clay at SUCF.OpportunityAdmin@suny.edu. EEO goals for this project: 6% minority workforce and 3% female workforce Service-Disabled Veteran-Owned Set Aside: No Minority Owned Sub-Contracting Goal: 17% Women Owned Sub-Contracting Goal: 13% Service-Disabled Veteran-Owned Business Contracting Goal: 6% Contract term: 462 calendar days after receipt of the Notice to Proceed

Award

Bridges / Tunnels

$3,986,000.00

Public - State/Provincial

Asbestos Abatement, Site Work

29

21

2

7

Subscribe For Documents

14 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Summary, Summary of Work, Work Covered by Contract Documents, Price and Payment Procedures, Allowances, Cash Allowances, Administrative Requirements, Project Management and Coordination, Project Meetings, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, Temporary Facilities and Controls, Temporary Utilities, Temporary Lighting, Construction Facilities, Sanitary Facilities, Vehicular Access and Parking, Traffic Control, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Erection, Cleaning and Waste Management, Commissioning
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Facility Remediation, Transportation and Disposal of Hazardous Materials, Asbestos Remediation
Division 03 - Concrete

Division 03 - Concrete

Concrete Reinforcing, Precast Concrete
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Clay Unit Masonry, Concrete Unit Masonry
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing, Metal Joists, Metal Fabrications, Metal Floor Plates
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Rough Carpentry, Structural Panels
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Dampproofing and Waterproofing, Fire and Smoke Protection, Firestopping
Division 08 - Openings

Division 08 - Openings

Doors and Frames, Metal Doors and Frames, Hollow Metal Doors and Frames, Hardware, Door Hardware, Glazing, Glass Glazing, Louvers and Vents, Vents
Division 09 - Finishes

Division 09 - Finishes

Painting and Coating, Painting
Division 10 - Specialties

Division 10 - Specialties

Interior Specialties, Partitions, Storage Specialties, Storage Assemblies
Division 12 - Furnishings

Division 12 - Furnishings

Furniture, Seating, Chairs
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping, Hangers and Supports for Plumbing Piping and Equipment, Plumbing Insulation, Plumbing Piping and Pumps, Facility Water Distribution, Plumbing Equipment, Electric Domestic Water Heaters, Fuel-Fired Domestic Water Heaters
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, Hangers and Supports for HVAC Piping and Equipment, HVAC Insulation, HVAC Piping and Pumps, Steam and Condensate Piping and Pumps, Steam and Condensate Heating Piping, HVAC Air Distribution, HVAC Ducts and Casings
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Hangers and Supports for Electrical Systems, Low-Voltage Electrical Distribution, Lighting
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Earth Moving, Grading, Excavation and Fill, Excavation, Trenching, Dewatering, Fill, Backfill, Compaction
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Site Improvements, Retaining Walls, Planting, Plants, Trees
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Material Processing and Handling Equipment, Piece Material Handling Equipment, Lifting Devices, Clamps

Find More Local Projects

Within 75 Miles of This Project
142
Active Projects
61
Bidding Soon
1,049
All Active Projects
427
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 22, 2023

March 22, 2023

img_map_placeholder

4400 Vestal Pkwy E, Binghamton, NY

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Replace High Temperature Hot Water (HTHW) Lines - SUNY Binghamton

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.