Site work and renovation of an educational facility in Walnut, California. Completed plans call for the renovation of a educational facility; and for site work for a educational facility.

Question Submission Deadline January 22, 2024, 2:00pm NOTICE TO BIDDERS NOTICE IS HEREBY GIVEN that Mt. San Antonio College of Los Angeles County, California, acting through its Governing Board of Trustees, hereinafter referred to as "District", shall receive electronic bids for the award of a contract for the Bldg. 16F Site Development & Tenant Improvement (Bid No. 2023-IFB-008). Lic. Class B, Prequalification. Contractors wishing to bid as a prime contractor for this project must be pre-qualified by the District 24 hours prior to the bid closing. Pre-qualification forms are available in OpenGov or by visiting the purchasing website at www.mtsac.edu/purchasing . Contractors must submit their completed pre-qualification packages and all required documentation to purconstruction@mtsac.edu on or before February 10, 2023. RFI s. Pre-bid RFI s are due in OpenGov under the Q&A tab by 2:00pm on February 15, 2023. Bids shall be valid for ninety (90) days after the bid deadline. Bids must be accompanied by cash, a certified or cashier's check, or a bid bond in favor of the Owner in an amount not less than ten percent (10%) of the submitted total bid price. The successful bidder will be required to furnish a performance bond and a payment bond, each in the amount of one hundred percent (100%) of the total bid price in the manner described in the Owner Documents. Bidders shall comply with California Public Contract Code Section 4108 with respect to subcontractor bond requirements. Community Workforce Agreement. The Project and the Work is subject to the Community Workforce Agreement ( CWA ) currently in place between the District and the Los Angeles/Orange Counties Building and Trades Department. The CWA and CWA Letter of Assent are incorporated into the Contract Documents in the Supplemental Conditions, Attachments A and B. Each Bidder must submit the completed and executed CWA Letter of Assent concurrently with submitting its Bid Proposal. All subcontractors must complete and execute the CWA Letter of Assent as a condition to performing any Work on the Project. Failure of any Bidders to submit the completed Letter of Assent form with its Bid Proposal will result in rejection of the Bidder s Bid Proposal for non-responsiveness. DIR Registration. Each Bidder submitting a proposal to complete the work, labor, materials, and/or services ( Work ) subject to this procurement must be registered with the Department of Industrial Relations pursuant to Labor Code 1725.5. A Bidder who is not a DIR Registered Contractor when submitting a proposal for the Work is deemed not qualified and the proposal of such a Bidder will be rejected for non-responsiveness. Pursuant to Labor Code 1725.5, all Subcontractors identified in a Bidder s Subcontractors List shall also be DIR Registered Contractors. Wages. This project requires that the Contractor and any subcontractor(s) shall pay not less than the prevailing rates of wages to all workers employed by them in the execution of the contract. Copies of schedules of rates so determined are on file in the Purchasing Office and are available to any interested party upon request. Pursuant to Labor Code 1771.4(a)(4), Prevailing Wage Rate monitoring and enforcement shall be by the Department of Industrial Relations. In accordance with provisions of Public Contract Code Section 223000, substitution of eligible and equivalent securities for any monies withheld to ensure performance under this contract will be permitted at the request and expense of the Contractor. The District reserves the right: (1) to accept or reject any and all bids, (2) to waive any irregularities in the bids or bidding, (3) to be sole judge as to the merit, quality, and acceptability of materials proposed and their compliance to the specifications which in their opinion will best serve the interest of the District. This project is a combination site development and Tenant Improvement project on a new modular building. The utilities have been brought to the site by another project. The concrete foundation and the modular facility (3,800 sf) will be provided by Silver Creek. The contractor scope includes: site utility connection to building for water, sewer, storm drain, IT /AV, electrical ; wiring for electrical, data, and AV with face plates; minor drywall work; tape and paint all walls; install HVAC units, ductwork, lights and T-bar ceiling; wire floor boxes for power, data. Plumbing for restrooms and sinks (fixtures provided). Landscaping, irrigation, site furniture, and trash cans to be in the scope. The Interior furniture will be by owner. All wiring to be tested for IT, AV and electrical per specs. Mt SAC team will install computers and AV equipment, except projection screen in the meeting room, which is contractor scope. All systems must be tested and user ready on the end date for school use. Recommendation for Award Date March 13, 2024 Engineer's Base Bid Estimate: $960,000.00

Award

Educational

$1,257,000.00

Public - State/Provincial

Renovation, Site Work

193

38

7

Subscribe For Documents

90 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Summary, Summary of Work, Work by Owner, Work Restrictions, Access to Site, Administrative Requirements, Project Management and Coordination, Submittal Procedures, Certificates, Special Procedures, Alteration Project Procedures, Quality Requirements, Regulatory Requirements, Temporary Facilities and Controls, Construction Facilities, Sanitary Facilities, Execution and Closeout Requirements, Examination and Preparation, Field Engineering, Execution, Application, Cleaning and Waste Management, Final Cleaning, Closeout Procedures, Closeout Submittals, Maintenance Data, Bonds, Warranties, Project Record Documents, Spare Parts, Demonstration and Training, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing, Reinforcing Steel, Cast-in-Place Concrete, Structural Concrete, Concrete Finishing
Division 04 - Masonry

Division 04 - Masonry

Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing, Cold-Formed Metal Framing, Metal Fabrications
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Architectural Woodwork, Architectural Wood Casework
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Joint Protection, Preformed Joint Seals, Joint Fillers
Division 08 - Openings

Division 08 - Openings

Doors and Frames, Metal Doors and Frames, Hardware, Door Hardware, Glazing, Glass Glazing
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Supports for Plaster and Gypsum Board, Suspension Systems, Tiling, Ceilings, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Painting and Coating, Painting
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Visual Display Surfaces, Signage, Interior Specialties, Partitions, Exterior Specialties, Protective Covers
Division 12 - Furnishings

Division 12 - Furnishings

Window Treatments, Casework, Furnishings and Accessories, Rugs and Mats, Runners, Furniture, Residential Furniture, Beds, Other Furnishings, Site Furnishings
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Elevators, Lifts
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping, Plumbing Insulation, Plumbing Piping and Pumps, Facility Water Distribution, Domestic Water Piping
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, Testing, Adjusting, and Balancing for HVAC, HVAC Insulation, Instrumentation and Control for HVAC, Pneumatic and Electric Control System for HVAC, HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Piping, HVAC Air Distribution, HVAC Ducts and Casings, Air Duct Accessories, Dampers, Air Outlets and Inlets, Central HVAC Equipment, Decentralized HVAC Equipment, Convection Heating and Cooling Units, Unit Heaters
Division 25 - Integrated Automation

Division 25 - Integrated Automation

Integrated Automation Facility Controls, Integrated Automation Control of Electrical Systems
Division 26 - Electrical

Division 26 - Electrical

Medium-Voltage Electrical Distribution, Medium-Voltage Transformers, Low-Voltage Electrical Distribution, Low-Voltage Transformers, Low-Voltage Distribution Equipment, Wiring Devices, Lighting, Interior Lighting
Division 27 - Communications

Division 27 - Communications

Communications, Voice Communications, Audio-Video Communications, Audio-Video Systems, Distributed Communications and Monitoring Systems, Distributed Audio-Video Communications Systems
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security, Electronic Detection and Alarm, Fuel-Gas Detection and Alarm
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Site Clearing, Earth Moving, Grading, Excavation and Fill, Excavation, Trenching, Dewatering, Fill, Backfill, Compaction, Special Foundations and Load-Bearing Elements, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Pruning, Bases, Ballasts, and Paving, Curbs and Gutters, Irrigation, Planting, Planting Preparation, Soil Preparation, Plants, Trees
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities, Storm Drainage Utilities, Storm Utility Drainage Piping, Public Storm Utility Drainage Piping, Culverts
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment, Coastal Construction, Shoreline Protection
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Piece Material Handling Equipment, Lifting Devices, Clamps, Lifts
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
173
Active Projects
82
Bidding Soon
2,146
All Active Projects
902
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 12, 2024

April 2, 2024

img_map_placeholder

1100 N Grand Ave, Walnut, CA

Find. Bid. Win. Your Next Project Starts Here.

Get the right
data with Project Intelligence

Share with your network.

Bldg. 16f Site Development & Tenant Improvement (Re-bid)

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.