EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 13, 2023 at 8:00 PM

Updated October 1, 2024

Demolition, site work and new construction of a water / sewer project in Arlington, Minnesota. Completed plans call for the demolition of a water / sewer project; for the construction of a water / sewer project; and for site work for a water / sewer project.

Online Bidding: Available Description: State Project No. 2023-284-02-8W208 This Project is Targeted Group (TG) Economically Disadvantaged (ED) Veteran-Owned preference. A. The work will be completed under one prime contract. B. The following summary is a general guide to the scope of work. It should not be construed as a detailed list of work included in the contract. 1. Demolish and remove existing concrete water control structure. 2. Construct 36'-6" long steel sheet pile water control structure. 3. Construct 36'-6" long steel walkway with grating and railing. 4. Excavate and dewater channel for construction. Any current subscription will be allowed to run until its natural expiration date. Existing portal subscriptions for unlimited downloads that expired before February 28, 2022, will be allowed to renew for one year. No new annual subscriptions will be accepted. If you need assistance please contact electronically.

Bid Results

Water / Sewer

$142,255.00

Public - State/Provincial

Demolition, New Construction, Site Work

Our team is requesting plans for this project.

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
122
Active Projects
66
Bidding Soon
834
All Active Projects
432
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 16, 2023

March 16, 2023

img_map_placeholder

To Be Determined, Arlington, MN

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.