BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 30, 2023 at 8:00 PM

Updated January 26, 2024

Site work, paving, environmental remediation, asbestos abatement, outdoor lighting, remodeling and renovation of a power facility in Wrangell, Alaska. Completed plans call for site work for a power facility.

**As of March 30, 2023, the project has not yet been awarded. A timeline for award has not yet been established.** The Southeast Alaska Power Agency (SEAPA) is seeking proposals from qualified industrial electric installation contractors to replace two SF6 Circuit Switchers at SEAPA's remote Tyee Lake Hydroelectric Facility Switchyard, located at the head of Bradfield Canal, approximately 40 miles SE of Wrangell, Alaska. Work must be performed during the established outage dates of May 31 through June 9, 2023.

Post-Bid

Power Plant

$260,000.00

Public - State/Provincial

Asbestos Abatement, Environmental Remediation, LEED Certification, Outdoor Lighting, Paving, Remodeling, Renovation, Site Work

21

8

2

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
1
Active Projects
0
Bidding Soon
9
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 20, 2023

May 31, 2023

Project location map

To Be Determined, Wrangell, AK

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.