Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work for a road / highway in Coalhurst, Alberta. Completed plans call for site work for a road / highway.
COLD MILLING, ASPHALT CONCRETE PAVEMENT (ACP) AND OTHER WORK 3:09 East of Hwy. 25 to Hwy. 4:07 / 43 Street kilometre 1.120 to 8.120 (EBL) 3:09 East of Hwy. 25 to Hwy. 4:07 / 43 Street kilometre 1.020 to 8.120 (WBL) GRADING, GRANULAR BASE COURSE (GBC), COLD MILLING, ASPHALT CONCRETE PAVEMENT (ACP), PORTLAND CEMENT CONCRETE PAVEMENT, UPGRADE OF TRAFFIC SIGNALS, ELECTRICAL AND CONTROL SYSTEMS UPGRADES, STREET LIGHT INSTALLATION AND OTHER WORK 3:09 to 10 Intersection Improvement (INT. 4131) Jct. of Hwy. 3:09 & Hwy. 4:07 kilometre 8.120 to 8.745 (EBL) kilometre 8.120 to 8.745 (WBL) kilometre 0.000 to 0.110 (EBL) kilometre 0.000 to 0.440 (WBL) 4:07 Intersection Improvement (INT. 4131) Jct. of Hwy. 3:09 & Hwy. 4:07 kilometre 4.840 to 5.210 (NBL) kilometre 5.145 to 5.210 (SBL) SOUTHERN REGION APPROXIMATE QUANTITIES: SCHEDULE A: HIGHWAY 3:09 EBL/WBL & WB STAFFORD DR. OFF-RAMP 1 Lump Sum Traffic Accommodation 2,225 Cubic Metre Subgrade Excavation 6,770 Square Metre Preparing Granular Surface 1,260 Tonne Granular Base Course Des. 2 Class 25 260 Metre Curb and Gutter (500mm Gutter) 3,640 Square Metre Topsoil - Supply and Place 233,920 Square Metre Cold Milling Asphalt Pavement - 50 mm Depth 81,690 Square Metre Cold Milling Asphalt Pavement - 80 mm Depth 9,530 Square Metre Cold Milling Asphalt Pavement - 200 mm Depth 50,040 Tonne Asphalt Concrete Pavement - Superpave - Mix Type 100-F-12.5 (PG 70-28) 51,300 Tonne Supply of Aggregate - With Option 3,340 Metre Remove and Dispose of Existing Guardrail 1,940 Metre Remove, Salvage, and Reinstall Strong Post W-Beam Guardrail (Rail Only) 3,604 Metre Strong Post W-Beam Guardrail - Supply and Install 27 Unit Impact Attenuator (NCHRP 350/MASH 2009 TL-3) - Supply and Install 14.23 Kilometre Durable Inlaid Roadway Lines - White Lane Dividing Lines (100 mm Thick) 7.72 Kilometre Durable Inlaid Roadway Lines - White Edge / Shoulder Lines (100 mm Thick) 7.93 Kilometre Durable Inlaid Roadway Lines - White Edge / Shoulder Lines (200 mm Thick) 45 Message Durable Inlaid Pavement Message - Stop Bar 23 Message Durable Inlaid Pavement Message - Crosswalk Line 29 Message Durable Inlaid Pavement Message - Gore Area SCHEDULE B: INTERSECTION 4131 (HWY 3 & HWY 4/43 ST) IMPROVEMENTS 920 Square Metre Concrete Surface - Remove and Dispose 6,200 Cubic Metre Subgrade Excavation 10,660 Square Metre Preparing Granular Surface 11,420 Tonne Granular Base Course Des. 2 Class 25 960 Metre Curb and Gutter (500mm Gutter) 4,900 Square Metre Solid Concrete Medians 270 Square Metre Truck Apron (Portland Cement Concrete Pavement) - Supply and Place 15,050 Square Metre Cold Milling Asphalt Pavement - 200 mm Depth 10,030 Tonne Asphalt Concrete Pavement - Superpave - Mix Type 100-F-12.5 (PG 70-28) 2,270 Tonne Asphalt Concrete Pavement - Superpave - Mix Type 100-F-20 (PG 70-28) 504 Square Metre Portland Cement Concrete Pavement - EPS 1 Lump Sum Temporary Traffic Signals 1 Lump Sum Traffic Signal System - Supply and Install Contractor to supply all materials.
Award
Roads / Highways
$16,733,182.00
Public - State/Provincial
Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 4, 2024
August 5, 2024
AB-3, Coalhurst, AB
Related To This Project
Coalhurst, AB
Bid Date: Jun 13 2023
Coalhurst, AB
Bid Date: Aug 25 2023
Coalhurst, AB
Bid Date: May 14 2019
Coalhurst, AB
--
Coalhurst, AB
Bid Date: Aug 01 2024
Coalhurst, AB
--
Coalhurst, AB
Bid Date: Jun 23 2022
Coalhurst, AB
Bid Date: Apr 28 2022
Hinton, AB
Bid Date: Nov 28 2023
Calgary, AB
Bid Date: Mar 05 2024
Edmonton, AB
Bid Date: Mar 07 2023
Edmonton, AB
--
La Crete, AB
Bid Date: Feb 28 2023
Edmonton, AB
--
St. Albert, AB
Bid Date: Feb 23 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Get the most reliable construction project data instantly.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.