Published November 13, 2023 at 7:00 PM

Updated October 1, 2024

Renovation of a water / sewer project in Norwich, Connecticut. Completed plans call for the renovation of a water / sewer project.

The work consists of furnishing all labor, materials, equipment and incidentals required for reconstruction of the Norwich, Connecticut Water Pollution Control Facility. The work generally includes construction of a new headworks, secondary clarifiers, UV disinfection system, effluent pump station, thickened sludge storage tank, vehicle and utility storage garage, and administration / laboratory building; modifications to existing primary clarifiers, aeration tanks including installing an IFAS aeration system, secondary clarifier, gravity thickener, sludge processing building, and demolition or modifications to other existing facilities. The work includes all process and related mechanical upgrades; civil, yard piping, and site work; HVAC and plumbing improvements; new electrical distribution and instrumentation and control systems; odor control system; demolition; and all other miscellaneous and other work as shown and indicated in the Contract Documents or otherwise necessary to complete the project. Complete instructions for filing Bids are included in the Instructions to Bidders. Wage rates for this Project are subject to the minimum wage rates as per the State of Connecticut Labor Department "Prevailing Wage Rates" and Federal Davis-Bacon Act. Any contract or contracts awarded under this Invitation to Bid are expected to be funded in part by the State of Connecticut Department of Energy and Environmental Protection. Neither the State of Connecticut nor any of its departments, agencies or employees is or will be a party to this Invitation to Bid or any resulting contract. The procurement will be subject to the requirements contained in Section 22a-482-4(h), (j) and (o) of the regulations of Connecticut State Agencies. Minority Business Enterprise (MBE) and Women['']s Business Enterprise (WBE) policies of the State of Connecticut are applicable to this Contract. The requirement for MBE/WBE Subcontractor participation, expressed as a percentage of the total contract amount, shall be a minimum of 8.0 percent with the following makeup, MBE 3.0 percent and WBE 5.0 percent. Failure to meet or exceed the required percentage shall render a bid non-responsive and cause the rejection of the Bid. Clean Water Fund Memorandum (CWFM) 2019-003 must be completed and submitted with the Bid, or that Bid will be deemed nonresponsive. All bidders must submit bids/proposals through the City Procurement Portal. Bidders and subcontractors are required to ensure equal opportunity employment as noted in the Governor Executive Orders 3, 16 and 17. Bidders must be prequalified through the Connecticut Department of Administrative Services (DAS) in the classification of Water Treatment Plants and must submit with their bid a copy of their Prequalification Certificate and a copy of their current Update (Bid) Statement. Substantial subcontractors (>$500,000) must also prequalify through the Connecticut DAS. Bidders on this work will be required to comply with the President Executive Order No. 11246 and any amendments or supplements to that Executive Order. Question Deadline 04/05/2023 at 5:00 AM ET

Bid Results

Water / Sewer

$161,971,622.00

Public - City

Renovation

486

70

25

21

Subscribe For Documents

138 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Summary, Multiple Contract Summary, Work Sequence, Price and Payment Procedures, Contract Modification Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Submittal Procedures, Certificates, Design Data, Quality Requirements, Regulatory Requirements, References, Definitions, Reference Standards, Quality Assurance, Supplier Qualifications, Installer Qualifications, Quality Control, Field Quality Control Procedures, Temporary Facilities and Controls, Temporary Construction, Vehicular Access and Parking, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Erection, Cutting and Patching, Cleaning and Waste Management, Final Cleaning, Starting and Adjusting, Checkout Procedures, Closeout Submittals, Maintenance Data, Bonds, Warranties, Project Record Documents, Spare Parts, Commissioning, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Existing Conditions, Common Work Results for Existing Conditions, Demolition, Building Demolition, Selective Structure Demolition, Site Remediation, Chemical Decontamination, Facility Remediation, Transportation and Disposal of Hazardous Materials, Asbestos Remediation
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Accessories, Concrete Reinforcing, Reinforcing Steel, Welded Wire Fabric Reinforcing, Cast-in-Place Concrete, Structural Concrete, Concrete Finishing, Specialty Placed Concrete, Precast Concrete, Precast Structural Concrete, Grouting
Division 04 - Masonry

Division 04 - Masonry

Masonry, Common Work Results for Masonry, Masonry Grouting, Unit Masonry, Clay Unit Masonry, Brick Masonry, Concrete Unit Masonry, Glass Unit Masonry, Stone Assemblies, Manufactured Masonry, Cast Stone Masonry
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing, Metal Decking, Steel Decking, Cold-Formed Metal Framing, Metal Fabrications, Metal Stairs, Metal Ladders, Metal Gratings
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Rough Carpentry, Sheathing, Underlayment, Gypsum Sheathing, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Dampproofing and Waterproofing, Dampproofing, Bituminous Dampproofing, Traffic Coatings, Thermal Protection, Thermal Insulation, Air Barriers, Steep Slope Roofing, Shingles and Shakes, Wood Shingles, Roofing and Siding Panels, Composite Roof Panels, Composite Wall Panels, Flashing and Sheet Metal, Sheet Metal Flashing and Trim, Roof and Wall Specialties and Accessories, Roof Accessories, Roof Hatches, Fire and Smoke Protection, Firestopping, Joint Protection, Joint Sealants, Expansion Control
Division 08 - Openings

Division 08 - Openings

Openings, Doors and Frames, Metal Doors and Frames, Hollow Metal Doors and Frames, Stainless-Steel Doors and Frames, Wood Doors, Flush Wood Doors, Plastic Doors, Specialty Doors and Frames, Coiling Doors and Grilles, Overhead Coiling Doors, Panel Doors, Entrances and Storefronts, Curtain Wall and Glazed Assemblies, Windows, Aluminum Windows, Bronze Windows, Stainless-Steel Windows, Steel Windows, Roof Windows and Skylights, Unit Skylights, Hardware, Door Hardware, Glazing, Glass Glazing, Louvers and Vents, Vents
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Gypsum Board Assemblies, Supports for Plaster and Gypsum Board, Suspension Systems, Gypsum Board, Tiling, Ceramic Tiling, Ceilings, Acoustical Ceilings, Acoustical Tile Ceilings, Flooring, Resilient Flooring, Terrazzo Flooring, Fluid-Applied Flooring, Resinous Flooring, Carpeting, Painting and Coating, Painting
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Visual Display Surfaces, Directories, Signage, Interior Specialties, Partitions, Toilet, Bath, and Laundry Accessories, Storage Specialties, Lockers, Postal Specialties, Exterior Specialties, Protective Covers
Division 11 - Equipment

Division 11 - Equipment

Vehicle and Pedestrian Equipment, Loading Dock Equipment, Commercial Equipment, Office Equipment, Educational and Scientific Equipment, Laboratory Equipment, Entertainment Equipment, Musical Equipment, Bells, Healthcare Equipment, Operating Room Equipment
Division 12 - Furnishings

Division 12 - Furnishings

Window Treatments, Casework, Specialty Casework, Laboratory Casework, Countertops, Furnishings and Accessories, Portable Lamps, Lamps, Bedroom Furnishings, Blankets, Rugs and Mats, Floor Mats, Furniture, Office Furniture, Seating, Institutional Furniture, Laboratory Furniture, Residential Furniture, Beds, Multiple Seating, Portable Audience Seating
Division 13 - Special Construction

Division 13 - Special Construction

Special Structures, Fabricated Engineered Structures, Integrated Construction
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Dumbwaiters, Elevators, Escalators and Moving Walks, Lifts
Division 21 - Fire Suppression

Division 21 - Fire Suppression

Water-Based Fire-Suppression Systems, Facility Fire-Suppression Water-Service Piping
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, Meters and Gages for Plumbing Piping, General-Duty Valves for Plumbing Piping, Hangers and Supports for Plumbing Piping and Equipment, Plumbing Insulation, Plumbing Piping and Pumps, Facility Water Distribution, Domestic Water Piping, Domestic Water Pumps, Plumbing Equipment, Domestic Water Filtration Equipment, Electric Domestic Water Heaters, Fuel-Fired Domestic Water Heaters, Plumbing Fixtures
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Meters and Gages for HVAC Piping, General-Duty Valves for HVAC Piping, Hangers and Supports for HVAC Piping and Equipment, Testing, Adjusting, and Balancing for HVAC, HVAC Insulation, Duct Insulation, Instrumentation and Control for HVAC, Sequence of Operations for HVAC Controls, HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Piping, Hydronic Pumps, Steam and Condensate Piping and Pumps, Steam and Condensate Heating Piping, HVAC Air Distribution, HVAC Ducts and Casings, Metal Ducts, Air Duct Accessories, Dampers, Flexible Connectors, HVAC Fans, Air Outlets and Inlets, Ventilation Hoods, Fume Hoods, Central Heating Equipment, Breechings, Chimneys, and Stacks, Central HVAC Equipment, Decentralized HVAC Equipment, Decentralized Unitary HVAC Equipment, Convection Heating and Cooling Units, Unit Heaters, Radiant Heating Units
Division 25 - Integrated Automation

Division 25 - Integrated Automation

Integrated Automation Facility Controls, Integrated Automation Control of Electrical Systems
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Low-Voltage Electrical Power Conductors and Cables, Grounding and Bonding for Electrical Systems, Hangers and Supports for Electrical Systems, Overcurrent Protective Device Coordination Study, Instrumentation and Control for Electrical Systems, Medium-Voltage Electrical Distribution, Medium-Voltage Transformers, Low-Voltage Electrical Distribution, Low-Voltage Transformers, Low-Voltage Switchgear, Switchboards and Panelboards, Panelboards, Low-Voltage Distribution Equipment, Wiring Devices, Low-Voltage Circuit Protective Devices, Fuses, Facility Electrical Power Generating and Storing Equipment, Packaged Generator Assemblies, Battery Equipment, Batteries, Battery Units, Static Uninterruptible Power Supply, Power Filters and Conditioners, Capacitors, Harmonic Filters, Transfer Switches, Automatic Transfer Switches, Electrical and Cathodic Protection, Facility Lightning Protection, Lighting, Interior Lighting, Emergency Lighting, Exterior Lighting
Division 27 - Communications

Division 27 - Communications

Communications, Voice Communications, Audio-Video Communications, Audio-Video Systems
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm, Fuel-Gas Detection and Alarm, Electronic Monitoring and Control, Electronic Detention Monitoring and Control Systems
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Geosynthetics for Earthwork, Commissioning of Earthwork, Geotechnical Instrumentation and Monitoring of Earthwork, Geotechnical Instrumentation and Monitoring, Special Foundation and Load Bearing Elements Instrumentation and Monitoring, Site Clearing, Earth Moving, Grading, Excavation and Fill, Excavation, Dewatering, Fill, Backfill, Compaction, Embankments, Erosion and Sedimentation Controls, Earthwork Methods, Soil Stabilization, Shoring and Underpinning, Shoring, Sheet Piling, Excavation Support and Protection, Special Foundations and Load-Bearing Elements, Driven Piles, Concrete Piles, Prestressed Concrete Piles, Bored Piles, Foundation Anchors, Tunneling and Mining
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Operation and Maintenance of Planting, Pruning, Bases, Ballasts, and Paving, Flexible Paving, Curbs and Gutters, Site Improvements, Fences and Gates, Retaining Walls, Planting, Planting Preparation, Mulching, Turf and Grasses, Plugging, Seeding, Plants, Shrubs, Trees
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Storage Tanks, Electrical Utilities, Electrical Utility Transmission and Distribution, Utility Substations, Communications Utilities, Communications Distribution
Division 34 - Transportation

Division 34 - Transportation

Transportation, Guideways/Railways, Monorails, Monorail Track, Transportation Signaling and Control Equipment, Railway Signaling and Control Equipment, Supervisory Control and Data Acquisition
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration, Instrumentation and Control for Process Systems, Process Control Auxiliary Devices
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Material Processing and Handling Equipment, Bulk Material Processing Equipment, Bulk Material Feeders, Feeders, Batching Equipment, Mixers, Piece Material Handling Equipment, Cranes and Hoists, Hoists, Derricks, Lifting Devices, Clamps, Hooks, Lifts, Manufacturing Equipment, Machining Equipment, Drilling Equipment, Mobile Plant Equipment, Mobile Earth Moving Equipment, Compactors, General Vehicles, Carts
Division 43 - Process Gas and Liquid Handling, Purification and Storage Equipment

Division 43 - Process Gas and Liquid Handling, Purification and Storage Equipment

Gas Handling Equipment, Gas Fans, Blowers and Pumps, Gas Compressors, Liquid Handling Equipment, Liquid Process Equipment, Liquid Aeration Devices, Gas and Liquid Purification Equipment, Gas and Liquid Purification Process Equipment, Chemical Feed Systems, Gas and Liquid Storage, Gas and Liquid Storage Equipment
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment
Division 45 - Industry-Specific Manufacturing Equipment

Division 45 - Industry-Specific Manufacturing Equipment

Industry-Specific Manufacturing Equipment (Division)

Find More Local Projects

Within 75 Miles of This Project
519
Active Projects
336
Bidding Soon
3,491
All Active Projects
1,648
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 26, 2023

November 27, 2023

img_map_placeholder

43 Falls Ave, Norwich, CT

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Upgrades to the Water Pollution Control Facility

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.