Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work for an educational facility in Tupper Lake, New York. Completed plans call for site work for a educational facility.
The vendor shall provide all labor and materials necessary to complete the work in a professional manner according to scope of work and architectural drawings if supplied. Work is to be completed within 90 days of award, unless modified below. This is a NYS Public Works project and prevailing wages are to be paid. Refer to attached specification for the following scope of work. Site must be cleaned and all materials secured at the end of each work day. Absolutely no scraps, especially fasteners, are to be left unsecured. Upon completion of before removal of equipment and scaffolding, contractor is to schedule a quality control and quality assurance inspection with Plant Superintendent. SCOPE OF WORK includes, but is not necessarily limited to the following. Provide and Install Signs as indicated within the Drawings and Specifications. Provide Sign Sample for Capital Services approval prior to the start of construction GENERAL REQUIREMENTS: 1. Bid price is to include all materials, labor, disposal of materials fees and site clean-up. Final acceptance of completed job will be provided by the appropriate Maintenance Supervisor. 2. Work is to be done between the hours of 7:30 am and 4 pm, Monday through Friday. Contractor is advised that this is an occupied home and may be occupied during these times. 3. All tools must be always controlled, and debris, tools and materials secured and stored at the end of each workday. 4. Any unforeseen conditions that may alter the established price are to be reported to the Plant Superintendent listed above immediately upon discovery. 5. Smoking is prohibited by contractors at all residential and program sites owned by OPWDD. 6. Prior to the commencement of the work, there shall be a meeting with DDSO Operations and Maintenance staff to discuss specific safety requirements needed to be adhered to during the work period. 7. Safety Data Sheets as applicable will be provided to the Plant Superintendent prior to the start of work and a copy maintained at the property. 8. All applicable environmental testing associated with this work will be provided to the contractor prior to start of work. A. Lawn Damage/Property Damage o If the delivery of materials or any other work necessitates the contractor, his suppliers, or sub-contractors to drive on the lawn for ANY reason, the contractor shall be held responsible for the repair of the lawn. o Personal vehicles are not to be parked on the grass. o Any property damage caused by work performed is to be corrected to the condition existing prior to start of the job. B. Continuity of Work/Communication/Scheduling o Once the job has begun, it is to be worked on continuously until completed. o If there are any delays, even if due to inclement weather, a Work Control Representative MUST be contacted. o Work must be completed within 90 days of receiving the purchase order. C. House Safety o The residence will be occupied during the job. o The contractor must take all reasonable care to safeguard the residents and the staff. o The contractor shall ensure all tools, materials and other items are picked up, removed or stored and are safely secured at the end of each workday. o Any ladders, scaffolding or lifts used in conjunction with this job are to be stored to the satisfaction of the House Director at the end of the day. o The work as indicated above shall be scheduled as not to interfered with other functions of the residence. All work performed as part of this job is to be coordinated with the House Director and Plant Superintendent listed above.
Bid Results
Educational
$63,426.00
Public - State/Provincial
Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
4
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 13, 2023
May 15, 2023
2445 NY-30, Tupper Lake, NY
Related To This Project
Tupper Lake, NY
Bid Date: Apr 04 2023
Tupper Lake, NY
Bid Date: Apr 04 2023
Tupper Lake, NY
Bid Date: Apr 20 2023
Tupper Lake, NY
Bid Date: Apr 13 2023
Tupper Lake, NY
Bid Date: May 23 2023
Tupper Lake, NY
Bid Date: May 25 2023
Tupper Lake, NY
Bid Date: Jun 30 2023
Tupper Lake, NY
Bid Date: Oct 23 2024
Tupper Lake, NY
Bid Date: Oct 03 2019
Tupper Lake, NY
--
Tupper Lake, NY
Bid Date: Sep 21 2022
Tupper Lake, NY
Bid Date: Jul 15 2022
Tupper Lake, NY
Bid Date: Jul 15 2022
Tupper Lake, NY
Bid Date: Jul 15 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.