BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in Norco, California. Completed plans call for site work for a playground / park / athletic field; sidewalk / parking lot; for paving for a sidewalk / parking lot; and water / sewer project.

The work to be done consists of furnishing all materials, equipment, tools, labor, and incidentals as required by the Plans, Specifications, and Contract Documents for the above stated project. The general items of work to be done hereunder consist of the demolition and removal of the existing playground, demolition and removal of the existing wood fiber chips, demolition and removal of the existing subbase and concrete ramps, relocation of drainage as needed, inspection of drainage and repairs as needed to ensure proper drainage, installation of playground subbase, installation of pour-in-place synthetic surfacing for the playground areas at Pikes Peak Park located at 97 Sixth Street, Norco, CA 92860 as described in the Specifications to the satisfaction and acceptance of the Facilities and Maintenance Director. Engineers Estimate Base Bid Scope $450,000 Bid Bond 10.00% Payment Bond 100.00% Performance Bond 100.00% I Procurement & Manufacturing (Completed by Others) 12 7/17/24 -10/9/24 II Demo & Installation of Subbase 2 9/23/24 - 10/10/24 III Installation of Playground (Completed by Others) 3 10/10/24 - 10/31/24 IV Installation of PIP 2 11/1/24 - 11/15/24 Question Deadline 08/22/2024 at 10:00 AM PT Online Q&A Yes Amanda Hamilton 951-270-5633 ahamilton@ci.norco.ca.us The Contractor shall complete all work in sixty (60) working days. Liquidated damages shall be assessed at $500.00 per working day. The City is looking to start the project the week of September 23, 2024 Pursuant to Section 1773 of the Labor Code, the general prevailing wage rates, including the per diem wages applicable to the work, and for holiday and overtime work, including employer payments for health and welfare, pension, vacation, and similar purposes, in the County of Riverside in which the work is to be done, have been determined by the Director of the Department of Industrial Relations, State of California. The City will deduct a 5 percent retention from all progress payments o The successful Contractor and his/her subcontractors will be required to possess a business license from the City of Norco. o No Exceptions will be made to City of Norco insurance requirements

Award

Playgrounds / Parks / Athletic Fields

$447,904.00

Public - City

Paving, Site Work

20

11

2

4

Subscribe For Documents

27 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
216
Active Projects
107
Bidding Soon
2,290
All Active Projects
904
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 29, 2024

September 23, 2024

img_map_placeholder

97 Sixth St, Norco, CA

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.