Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and paving for a civil project in North Port, Florida. Conceptual plans call for site work for a road / highway; for paving for a road / highway; bridge / tunnel; and bridge / tunnel.
This project includes reconstruction of the interchange at Fruitville Road in Sarasota County from the existing partial cloverleaf configuration to a diverging diamond interchange. The project will widen about 2 miles of I-75, from Palmer Boulevard to north of Fruitville Road through reconstruction of the existing 6-lane highway and te addition of auxiliary lanes and will replace the existing bridges over Fruitville Road. The project will also include widening of about 1.6 miles of Fruitville Road from Honore Avenue to east of Coburn Road. As of September 26, 2023, this project is in the conceptual phase. Information regarding a design firm and the general contractor selection timeline has not been disclosed. Although a firm timeline for construction has not been determined, project is letting is not expected to start prior to May of 2025. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.
Conceptual
Roads / Highways
$192,000,000.00
Public - State/Provincial
Paving, Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 2, 2024
I-75, North Port, FL
Related To This Project
North Port, FL
Bid Date: Mar 20 2023
North Port, FL
Bid Date: Jul 03 2024
North Port, FL
Bid Date: Aug 24 2021
North Port, FL
Bid Date: Aug 04 2021
North Port, FL
Bid Date: Feb 21 2019
North Port, FL
Bid Date: Jul 11 2023
North Port, FL
Bid Date: Jul 14 2023
North Port, FL
Bid Date: Jul 20 2023
North Port, FL
Bid Date: Apr 24 2023
North Port, FL
--
North Port, FL
--
North Port, FL
--
North Port, FL
Bid Date: Mar 21 2023
North Port, FL
Bid Date: Mar 08 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.