BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition, site work and new construction of a water / sewer project in Clearwater, Florida. Completed plans call for the demolition of a water / sewer project; for the construction of a water / sewer project; and for site work for a water / sewer project.

Scope of Work - 1. Demolition of the existing LS-16 facilities. This includes the existing wetwell, valve vaults, concrete slab, valves, piping, conduits/cables, electrical/control panels, light fixtures, instrumentation/control equipment, fencing, etc. as shown in the Contract Documents. City of Clearwater | Engineering Department | 727-562-4750 | 100 S Myrtle Ave. #220, Clearwater, FL 33756 2. Site civil work associated with the WORK, including site preparation grading, erosion control, excavation and backfill materials. Modifications to manholes and bypass pumping as shown in the Contract Documents as well as restoration work of pervious and impervious areas affected by the construction activities. 3. Installation of a new 15-ft diameter, cast in place wetwell with three submersible, solids handling pumps, inclusive of all accessories and appurtenances as shown in the Contract Documents. The wetwell rim shall be installed at elevation 15.0-ft. this includes commissioning and start up services including individual equipment startup and testing; piping system testing; providing the services of manufacturer field technician and representatives to provide services for installation, startup, and training; coordination with the OWNER, ENGINEER, other CONTRACTORS, and regulatory agencies. 4. Furnish and install cable, conduits, light fixtures, electrical panels, transformer(s), automatic transfer switch, lightning protection system and equipment (including new natural gas backup generator), flow meter, pressure gauge, level transducers, floats, telemetry control units (TCU), and control panels shown in the Contract Documents. The Contractor shall also perform a short circuit and coordination study as part to the WORK. Electrical panels shall be installed at elevation 17.0-ft. The existing communications antenna should also be relocated as part of this work. 5. Furnish and install elevated structures, retaining walls and platforms to service and maintain the wetwell, electrical, control and instrumentation equipment as shown in the Contract Documents. 6. Protection, removal, replacement and overall improvements of landscape features at the site. This includes furnish and installation of irrigation system, trees, plants and shrubs as shown in the Contract Documents 7. Furnish and install extruded aluminum protective cover, inclusive of fixed, extruded aluminum louvers and structural elements as show in the Contract Documents. The structural components of the protective cover shall be coordinate such as it will be supported from structural platform components, but not be integral to these components. This Item is item is classified as a BID ALTERNATE. The WORK is located immediately East of the existing LS-16 facilities, approximately 600-ft West of the intersection of S Osceola Ave and Pierce St., across from the public parking lot.

Award

Water / Sewer

$7,933,000.00

Public - City

Demolition, New Construction, Site Work

89

16

8

4

Subscribe For Documents

24 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
255
Active Projects
108
Bidding Soon
1,954
All Active Projects
756
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

March 22, 2023

May 22, 2023

February 16, 2024

img_map_placeholder

Pierce St, Clearwater, FL

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.