BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of an educational facility in Honolulu, Hawaii. Completed plans call for the renovation of a educational facility.

Questions Deadline: 02/22/2023 Answers Due Date: 02/24/2023 Heating, Air Conditioning, and Ventilation Maintenance and Repair Services (Including Installation) Twenty-Nine (29) 23,000 BTU Window A/C Units. LG Model LW2422IVSM or approved equal Two (2) units in each room: Building B - Rooms 1-5 Building C - Rooms 1-4 Building D - Rooms 1-5 One (1) unit in Building D - Teacher Workroom Air Conditioning Units: 1. Before ordering equipment, provide specifications of A/C units to Project Coordinator for approval. 2. All units must have a 1-Year Equipment Warranty from Manufacturer or Supplier 3. All units must be Energy Star-rated with a minimum CEER of 10.3. 4. All A/C units shall be installed with condensation drain lines. If the water will not affect the walkways, then it is not necessary. The drain lines do not need to be painted. 5. Any equipment and/or installation changes identified during the pre-bid meeting/walkthrough shall be verified and approved by the Project Coordinator. Changes will be posted as an Addendum to the Scope. 6. All A/C units will be framed with painted 2 x 4. This is a DOE Facilities requirement. If not framed, changes identified shall be verified and approved by the Project Coordinator. Frame out is recommended using 1/2 " plywood and painted to match existing color. 7. All wood around the A/C units will be painted (interior and exterior). Electrical: 1. Contractor shall provide all necessary components for a complete installation of all A/C units; including but not limited to conduits, wiring, outlets, etc. 2. Sub-panels shall be added if needed. If possible, new panel should contain all A/C breakers. Panel can be located in storage closet adjacent to panel. 3. Electrical may be pulled from the 1 st floor for the 2 nd floor installation and vice versa. Patching 1. All penetrations through walls/windows shall be completely sealed. 2. All added and/or replaced lumber and/or plywood shall be patched and painted. Wood trim shall be used for gaps larger than 1/4 inch. 3. Any damages caused by the Contractors work shall be properly patched and painted to match surrounding areas. Windows/Louvres 1. Windows and louvres must be operational post-installation. If the windows will not be opened after the A/C's are installed, then it does not have to be operational.

Award

Educational

$75,143.00

Public - State/Provincial

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
25
Active Projects
7
Bidding Soon
96
All Active Projects
47
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 3, 2023

April 3, 2023

img_map_placeholder

2301 Pauoa Rd, Honolulu, HI


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.