Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
This is a service / maintenance or supply contract in Eastpoint, Florida. Contact the soliciting agency for additional information.
Project Threshold : Project is greater than or equal to $500,000.00 (Technically Prequalified & Unlimited Audit required) Selection Method : Expanded Letter of Response Professional Liability Insurance : $500,000.00 Financial Management Numbers : 44575916201 CEI SR 77 in Washington County TRC Members (Subject to Change) : Gabriella Molina-Corbin Jeff Kerwin Michael Horton The goal of the Departments Under-Utilization strategy is to encourage and promote use of Disadvantaged Business Enterprises (DBE) and Small Businesses in areas of work where they have been under-used. Under-Utilization is defined by FDOT as 25% or less utilization level in a Work Group, which may vary by district. The specific Under-Utilized Work Groups are identified in the advertisement. Consultants are strongly encouraged to propose a DBE or Small Business to perform services for each Under-Utilized Work Group identified in the advertisement. Shortlist Selection Date/Time 2/27/2023 08:30 pm Final Selection Date/Time 3/13/2023 07:30 pm Negotiations Period Begin Date 3/28/2023 Negotiations Period Ending Date 4/25/2023 FDOT - RFP Engineering - RFP Engineering - CEI SR 30 (US 98) in Franklin County The method of contractor selection has not been determined at this time.
Conceptual
Roads / Highways
$851,970.00
Public - State/Provincial
Service, Maintenance and Supply
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
August 21, 2023
FL-30, Eastpoint, FL
Related To This Project
Eastpoint, FL
--
Eastpoint, FL
Bid Date: May 24 2023
Eastpoint, FL
Bid Date: Aug 14 2023
Eastpoint, FL
Bid Date: Aug 14 2023
Eastpoint, FL
Bid Date: Dec 28 2021
Eastpoint, FL
Bid Date: Dec 04 2023
Eastpoint, FL
--
Eastpoint, FL
Bid Date: Mar 04 2024
Eastpoint, FL
Bid Date: Jan 25 2023
Eastpoint, FL
--
Eastpoint, FL
Bid Date: Jun 10 2021
Eastpoint, FL
--
Eastpoint, FL
Bid Date: May 02 2022
Eastpoint, FL
Bid Date: Jun 15 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Get the most reliable construction project data instantly.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.