Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published June 8, 2023 at 8:00 PM
Updated January 26, 2024
Site work and paving for a civil project in Eastpoint, Florida. Completed plans call for site work for a water / sewer project; road / highway; and for paving for a road / highway.
Counties: Franklin Road Name: Sr 30 (Us 98) Limits: From W of Sr 377 (Us 319) to Ochlockonee Bay Br Project(s): 44575915201(*) Project(s): 44575915202 Federal Aid No: D322068B Total Roadway Length: 10.560 Miles Total Bridge Length: 1.120 Miles Total Proposal Length: 11.680 Miles Contract Days: 345 Contract Execution Days: 10 The improvements under this contract consist of milling and resurfacing, base work, drainage improvements, curb and gutters, guardrail, traffic signals, signing and pavement markings, lighting, and other incidental construction along SR 70 from East of US 441 to NE 17th Avenue in Okeechobee County. A Proposal Guaranty of not less than five percent (5%) of the total actual bid in the form of either a certified check, cashiers check, trust company treasurers check, bank draft of any national or state bank, or a Surety Proposal Guaranty made payable to the Florida Department of Transportation A 100% Payment and Performance Bond will be required for all projects unless noted otherwise in the project specifications FL DOT - 006 - Resurfacing/Drainage Improvements
Award
Roads / Highways
$14,273,753.00
Public - State/Provincial
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 24, 2023
June 3, 2023
FL-30, Eastpoint, FL
Related To This Project
Eastpoint, FL
Bid Date: Aug 14 2023
Eastpoint, FL
Bid Date: Aug 14 2023
Eastpoint, FL
Bid Date: Dec 28 2021
Eastpoint, FL
Bid Date: Dec 04 2023
Eastpoint, FL
--
Eastpoint, FL
Bid Date: Mar 04 2024
Eastpoint, FL
Bid Date: Mar 18 2024
Eastpoint, FL
Bid Date: Jul 23 2019
Eastpoint, FL
--
Eastpoint, FL
--
Eastpoint, FL
Bid Date: Jan 25 2023
Eastpoint, FL
--
Eastpoint, FL
Bid Date: Jun 10 2021
Eastpoint, FL
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
