Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Create your *free account*
Fill in a few details to keep viewing projects.
You've used your *free project views*
Register today to keep viewing commercial construction projects bidding in your area.
With ConstructConnect Project Intelligence, you can:
- Filter 825,000+ active commercial projects down to the ones that fit your trade and area
- Reach the right people with contact info for 575,000+ construction companies
- See who's bidding before you put in the hours
- Get daily email updates and alerts on the projects you're watching
Published February 21, 2025 at 7:00 PM
Updated February 22, 2025
Site work and paving for a mixed-use development in Eastpoint, Florida. Design plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.
As of February 21, 2025, an engineer has been selected and this project is in the design phase with anticipated completion in July 2026. A firm timeline for bidding and start of construction has not been determined. *The closed solicitation has been included below for reference: District : 03 Selection Method : Letter of Response and Oral Presentation Project Description : SR 30 (US 98) Bike Path/Trail Design Group 1 Plain Language Description : It is the Department's intent to award two contracts from this procurement. The consultants will perform all services required to produce a complete set of construction plans and bid documents for a bike path/trail on SR 30 (US 98) from Hinson Street to Crooked River Road and 30 (US 98) from Kenneth B Cope Avenue to Lake Morality Road. Services will include, but are not limited to roadway design, survey, minor bridge design, load rating, signing and pavement marking, lighting, and geotechnical. Number of contracts that may be awarded from this advertisement : 2 Advertisement Date 4/02/2024 Response Deadline Date/Time 4/16/2024 02:30 am Shortlist Selection Date/Time 4/29/2024 07:30 pm Phase II Submittal Deadline Date/Time 5/22/2024 01:30 am Oral Presentation Date/Time 5/23/2024 Final Selection Date/Time 6/10/2024 07:30 pm Negotiations Period Begin Date 6/25/2024 Negotiations Period Ending Date 8/20/2024 The method of contractor selection has not been determined at this time. FL DOT - RFP Engineering - SR 30 (US 98) Bike Path/Trail Design Group 1
Design
Roads / Highways
$1,500,000.00
Public - State/Provincial
Paving, Site Work
We’ve obtained documents for this project and are currently processing them.
Trades Specified
Division 00 - Lorem Ipsum
Always Free
- Use filters and keyword searches to find valuable projects
- Get promoted to General Contractors and receive ITBs
- Access limited project details, bid dates, and locations
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Unlock the Full Project List
Access every active project near you — get started today.
- 825,000+ active commercial projects tracked daily
- Verified contact info for the GC, owner, and architect
- New leads delivered to your inbox every morning
Create your account to get started.
Takes less than a minute — no credit card needed