BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 6, 2024 at 7:00 PM

Updated June 21, 2025

Site work and paving for a road / highway in Eastpoint, Florida. Completed plans call for site work for a road / highway; and for paving for a road / highway.

Counties: Franklin Road Name: SR 30 (US 98) RANKLIN COUNTY (49010000 & 49010001) Limits: From Apalachicola River Bridge to Franklin St Project(s): 22392035201(*) Federal Aid No: D323004B Project(s): 22392035203 Federal Aid No: D323004B Total Roadway Length: 10.547 Miles Total Bridge Length: 2.684 Miles Total Proposal Length: 13.231 Miles Contract Days: 197 Contract Execution Days: 10 Special Start Date: N/A Aquis/Flexible Start Time: 120 Days Please read the full advertisement Description: The Improvements under this Contract consist of milling and resurfacing SR 30 (US 98) from Apalachicola River Bridge to Franklin Street; in Franklin County, FL. There are two FPID numbers within this Contract. FPID 223920-3-52-01 includes milling and resurfacing. FPID 223920-3-52-03 includes the addition of articulating concrete block to protect shoulders. Question Deadline 11/06/2024 at 5:00 PM Questions posted to this site will be responded to by the Department. For questions posted after this time, an answer cannot be assured. For all questions posted before the deadline, FDOT will provide and post responses on online. For bids over $150,000.00, the standard proposal guaranty of 5% of the bid will be required, unless otherwise stipulated in the proposal advertisement. A Proposal Guaranty of not less than five percent (5%) of the total actual bid in the form of either a certified check, cashier's check, trust company treasurer's check, bank draft of any national or state bank, or a Surety Proposal Guaranty made payable to the Florida Department of Transportation must be received for each bid in excess of $150,000.00 A 100% Payment and Performance Bond will be required for all projects. All work is to be done in accordance with the Plans, special Provisions of the State of Florida Department of Transportation. FDOT - Call Order: 006 - Drainage Improvements / Resurfacing - SR 30 (US 98)

Award

Roads / Highways

$4,631,224.00

Public - State/Provincial

Paving, Site Work

93

7

3

7

Subscribe For Documents

49 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
82
Active Projects
30
Bidding Soon
424
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 13, 2024

January 13, 2025

Project location map

FL-30, Eastpoint, FL

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.