BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of an educational facility in Greensboro, North Carolina. Completed plans call for the renovation of a educational facility.

As of March 16, 2023, project was awarded to Sasser Companies, LLC, awarded amount is $63,520.93. The University's goal is to begin this project on March 1, 2023 with completion on or before April 14, 2023. Completion shall not be considered to have occurred until all work including punch lists have been completed. Upon completion of the project, the Vendor shall remove and properly dispose of all waste and debris from the site. The Vendor shall be responsible for leaving the area clean and ready to use, this includes replacing furniture back in location, complete clean up all dust, dirt and clean all fixtures for occupancy. SCOPE OF WORK CHANGE ORDER The university does not foresee changes to the scope of work once work has begun on the project. However, if the contractor or the university request a change, the following process shall be used. o Either party shall present a written detailed description of the change request, and a justification for the request(s). o The contractor shall provide the university with a written quote with a detail description of the changes to the project manager. The university shall provide a written approval to move forward or a rejection of the change order. NO SCOPE CHANGES SHOULD COMMENCE WITHOUT A WRITTEN APPROVAL FROM THE UNIVERSITY PROJECT MANAGER. o The university shall issue a change to the purchase order to the contractor based on the approved quote. If you plan to attend this site visit, please submit ATTACHMENT H: INTENT TO ATTEND SITE VISIT to Nikki Williams at mcwilli2@ncat.edu, on or before Friday, February 10, 2023 at 3:00 p.m. ET. 1.5 QUESTIONS ABOUT QUOTE Purpose: Upon review of the RFQ documents, Vendors may have questions to clarify or interpret the RFQ in order to submit the best quote possible. To accommodate the Quote Questions process, Vendors shall submit any such questions by Wednesday, February 15, 2023 at 12:00 p.m. Instructions: Written questions shall be emailed to mcwilli2@ncat.edu by the date and time specified above. Vendors should enter "RFQ # 59-Q6577 - Questions" as the subject for the email. Question submittals should include a reference to the applicable RFQ section and be submitted in the format shown below: Scope o Propress compression fittings are the preferred attached method. Pressurize the system 24 hours before cut the water back on. o Provide three (3) new cut off valves in the powder room. o Mechanical - Provide a new main duct insulated trunk line. Remove the existing trunk line and replace with new trunk line. Provide new flex duct in the crawl space. Ducts will be sized by schedule J calculations for size and r value. Place all grill covers back in the original location, all air filters will be replaced matching existing fillers. HVAC work must to be done by license contractor. o Install two (2) new thermostats model Smart Thermostat Premium by ecobee for upstairs and down stairs units. Source website. o Provide insulation in the crawl space, and 2' high of the outside wall, including the front porch ceiling area. Match existing R values. o Provide crawl space vapor barrier per North Carolina building code 100% coverage of the crawl and 6 mil thick plastic. o Install new base boards from the first floor, 7 inch speed base clear popular finger jointed match existing profile. o Install 1/2 " drywall in the den ceiling and 2' high on outside walls. Matching existing wall finish (Statch pattern). The kitchen area also has a textured wall finish. (Splotch pattern) o Paint walls and den ceiling, matching existing colors. Walls will be from corner to corner. In addition, paint trim to match existing colors. Painting will follow N.C. A&T standards that is full coverage. prime and two (2) finish coats. Note: The contractor is expected to match paint by taking a chip of paint to Sherwin Williams. o Provide 2 1/4 " oak hardwood flooring to match existing suit size and finish (Approximately 1580 square feet), Install oak quarter round stained to match flooring (approximately 300 LF). Oak quarter round will match the starter step at the stairs. The flooring must be finished onsite. The flooring subcontractor must provide samples of flooring finish to the university project manager for approval prior to staining the floor. Install 15 lb felt paper under the hardwood as an underlayment. o The contractor must provide HEPA filtered dust collection for all sanding and cutting inside on the house.

Award

Educational

$63,521.00

Public - State/Provincial

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

6

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
150
Active Projects
60
Bidding Soon
1,609
All Active Projects
663
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 20, 2023

March 1, 2023

img_map_placeholder

4000 Hazel Ln, Greensboro, NC


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.