Renovation of a residential development in Buckley, Washington. Completed plans call for the renovation of a residential development.

For a quote to be valid, a completed Pierce County Quotation and Contract Form and Certification of Compliance with Wage Payment Statutes Form (included in this package) must be received by the County no later than the time and date specified herein or as amended through addendum. Vendor must use the Pierce County Quotation and Contract Form; vendors forms are not acceptable. Additionally, for a quote to be valid, there can be no bidder submitted variations to the Statement of Work or other terms presented in the Request for Quotation package. Any questions bidders have with regard to the Statement of Work must be submitted to the County Point of Contact in writing 48 hours prior to the quotation submission cut-off date and time. 3. Bonds and Retainage A bid bond will not be required for this work. For Public Works contracts less than or equal to $50,000 including tax and purchase services contracts which include services requiring the payment of prevailing wages less than or equal to $50,000 including tax, the County shall waive retainage and bonding but will retain the right of recovery against the Contract for any payments made on the Contractor's behalf. Contract Time The notice to proceed will be issued within five (5) to ten (10) calendar days of the execution of the Contract by the County. Should there be reasons why the notice to proceed cannot be issued within such period, the time may be extended by mutual agreement between the County and Contractor. All project work shall be completed within 60 calendar days of issuance of the Notice to Proceed by the County. 6. General Requirements All work shall be subject to a final Inspection by a Pierce County Human Services Housing Rehabilitation Specialist. Standards for satisfactory completion of work shall be determined by the intent of the Contract, applicable building code requirements, the Specifications and the Contractor's Manual. All work found to be lacking in any of these areas shall be repaired or redone at the Contractor's expense. Please offer a bid based on the information that is provided. Do not make assumptions on other work that may be necessary when completing this bid. It is expected that the winning bidder will assess the problem onsite and verify all measurements before proceeding with work. The information and measurements provided by Pierce County are offered to enable bids to be prepared. Discrepancies (high or low) between estimates and actual measurements and onsite assessment will be addressed with change orders. Roof projects do NOT include detached structures. Please see photos of existing conditions for each project. Please see specifications provided and those included in Contractor's Manual, for more details. Contractor to provide material warranty information to county and client. ENVIRONMENTAL REQUIREMENTS Access and staging, source sites, and disposal sites remain at least 150 feet away from rivers, lakes, the sound, etc. Waste materials are recycled or otherwise disposed of in a properly permitted sanitary or hazardous waste disposal site. ANY AND ALL APPLICABLE PERMITS The bid submitted shall include the cost of securing any and all applicable permits. L&I PREVAILING WAGE DOCUMENTATION The bid submitted shall include costs for filing Intents & Affidavits with Labor and Industries. DESCRIPTION OF HOME INTENT OF REPAIR: Remove and replace composition roof. RESIDENCE TYPE: Double-wide Mobile Home YEAR BUILT: 1999 HOME SQ FT: 1,728 LOCATION: Buckley Contractor shall remove and dispose of all old roofing material, vents, and boots. Inspect sheathing condition and replace estimated 10 sheets of damaged material with new 7/16 OSB or CDX plywood to match existing. Contractor to provide and install 190 Ln ft of "D" metal drip edge at eave in a manner that flashes gutter fin. Apply Grace Ice & Water Shield or equivalent per manufacturer specifications and at minimum at eaves, gable ends and valleys (if any). Apply synthetic underlayment over entire roof deck per L&I specifications. Provide and install 8 new roof vents, 3 new exhaust fan vents and 3 new 3" plumbing boots. Install estimated 20 sqs. shingles per manufacturer's specifications and to adhere to manufacturer's warranty, especially as it applies to low slope roofs. Incidental roof penetrations such as antennae wire shall use threaded fasteners and be sealed with elastomeric sealant. Clean up and haul away job debris and ensure that bath fan and vents, range hood and vents, and gutters and downspouts are clean, free of obstructions and working properly.

Award

Residential Subdivision

$27,200.00

Public - County

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
71
Active Projects
46
Bidding Soon
730
All Active Projects
261
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 24, 2023

March 27, 2023

img_map_placeholder

Multiple Locations, Buckley, WA

The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.